7.
Remove
the
protective
label
from
the
internal
battery
connector.
8.
Connect
the
internal
battery
connector.
Note:
A
small
amount
of
arcing
might
occur
when
connecting
the
batteries.
This
is
normal
and
does
not
damage
the
unit
or
present
any
safety
concerns.
9.
Reinstall
the
front
panel.
10.
At
the
back
of
the
2145
UPS-1U,
plug
the
2145
UPS-1U
main
power
connector
into
the
power
socket
(
1
in
The
2145
UPS-1U
is
in
standby
mode,
so
all
indicators
are
off.
Note:
The
2145
UPS-1U
is
intended
to
maintain
power
on
SAN
Volume
Controller
nodes
until
data
can
be
saved
to
the
local
hard
disk
drive.
Only
SAN
Volume
Controller
nodes
can
be
plugged
into
the
2145
UPS-1U
or
the
SAN
Volume
Controller
cluster
malfunctions.
svc00062
Figure
32.
Internal
battery
connector
with
protective
label
svc00061
Chapter
4.
Installing
the
UPS,
the
master
console,
and
the
SAN
Volume
Controller
55
Содержание SAN Volume Controller 2145-8F4
Страница 1: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Страница 2: ......
Страница 3: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Страница 8: ...vi IBM System Storage SAN Volume Controller Installation Guide...
Страница 74: ...44 IBM System Storage SAN Volume Controller Installation Guide...
Страница 78: ...48 IBM System Storage SAN Volume Controller Installation Guide...
Страница 120: ...90 IBM System Storage SAN Volume Controller Installation Guide...
Страница 122: ...92 IBM System Storage SAN Volume Controller Installation Guide...
Страница 128: ...98 IBM System Storage SAN Volume Controller Installation Guide...
Страница 134: ...104 IBM System Storage SAN Volume Controller Installation Guide...
Страница 138: ...108 IBM System Storage SAN Volume Controller Installation Guide...
Страница 141: ......
Страница 142: ...Part Number 31P0797 Printed in USA GC26 7900 00 1P P N 31P0797...
Страница 143: ...Spine information IBM System Storage SAN Volume Controller Installation Guide Version 4 1 0...