3.
Gently
push
the
latch
lock
2
away
from
the
rail
as
you
move
the
latch
lever
1
toward
the
far
end
of
the
rail
The
latch-lock
carrier
assembly
slides
against
the
spring
tension.
1
Latch-lever
2
Latch-lock
4.
Continue
to
slide
the
latch-lock
carrier
for
approximately
13
mm
(0.5
in).
The
latch-lever
engages
a
hole
in
the
back
bracket
assembly
and
holds
the
latch-lock
carrier
in
the
retracted
position.
5.
Push
the
back
rail
bracket
1
toward
the
front
of
the
rail
until
it
stops.
The
rail
is
now
at
its
shortest
adjustment.
1
Back
rail
bracket
2
Latch-lock
1
2
1
2
23nl1c
Figure
44.
Opening
the
front
latch-lock
carrier
assembly
2
1
3
Figure
45.
Opening
the
back
latch-lock
carrier
assembly
Chapter
4.
Installing
the
UPS,
the
master
console,
and
the
SAN
Volume
Controller
67
Содержание SAN Volume Controller 2145-8F4
Страница 1: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Страница 2: ......
Страница 3: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Страница 8: ...vi IBM System Storage SAN Volume Controller Installation Guide...
Страница 74: ...44 IBM System Storage SAN Volume Controller Installation Guide...
Страница 78: ...48 IBM System Storage SAN Volume Controller Installation Guide...
Страница 120: ...90 IBM System Storage SAN Volume Controller Installation Guide...
Страница 122: ...92 IBM System Storage SAN Volume Controller Installation Guide...
Страница 128: ...98 IBM System Storage SAN Volume Controller Installation Guide...
Страница 134: ...104 IBM System Storage SAN Volume Controller Installation Guide...
Страница 138: ...108 IBM System Storage SAN Volume Controller Installation Guide...
Страница 141: ......
Страница 142: ...Part Number 31P0797 Printed in USA GC26 7900 00 1P P N 31P0797...
Страница 143: ...Spine information IBM System Storage SAN Volume Controller Installation Guide Version 4 1 0...