background image

Power Systems

Installing the IBM Power System S922

(9009-22A and 9009-22G), IBM Power

System H922 (9223-22H), or IBM Power

System H922S (9223-22S)

IBM

GI11-9931-04

Содержание S922

Страница 1: ...Power Systems Installing the IBM Power System S922 9009 22A and 9009 22G IBM Power System H922 9223 22H or IBM Power System H922S 9223 22S IBM GI11 9931 04...

Страница 2: ...G229 9054 and the IBM Environmental Notices and User Guide Z125 5823 This edition applies to IBM Power Systems servers that contain the POWER9 processor and to all associated models Copyright Interna...

Страница 3: ...in the rack 2 Attaching the mounting hardware to the rack 4 Installing the system into the rack 7 Installing the cable management arm 9 Cabling the server and setting up a console 12 Cabling the serv...

Страница 4: ...iv...

Страница 5: ...00 300 8751 German safety information Das Produkt ist nicht f r den Einsatz an Bildschirmarbeitspl tzen im Sinne 2 der Bildschirmarbeitsverordnung geeignet Laser safety information IBM servers can use...

Страница 6: ...otherwise 2 For AC power remove the power cords from the outlets 3 For racks with a DC power distribution panel PDP turn off the circuit breakers located in the PDP and remove the power from the Custo...

Страница 7: ...n a different rack cabinet An electrical outlet that is not correctly wired could place hazardous voltage on the metal parts of the system or the devices that attach to the system It is the responsibi...

Страница 8: ...at you plan to take to eliminate potential hazards Verify that the route that you choose can support the weight of the loaded rack cabinet Refer to the documentation that comes with your rack cabinet...

Страница 9: ...position for example when working from a ladder Stability hazard The rack may tip over causing serious personal injury Before extending the rack to the installation position read the installation ins...

Страница 10: ...or multiple DC power cables To remove all hazardous voltages disconnect all power cords and power cables L003 L007 CAUTION A hot surface nearby L007 x Power Systems Installing the IBM Power System S92...

Страница 11: ...ing into the other end of a disconnected optical fiber to verify the continuity of optic fibers may not injure the eye this procedure is potentially dangerous Therefore verifying the continuity of opt...

Страница 12: ...o take care not to push or lean Keep riser tilt adjustable angling platform option flat at all times except for final minor angle adjustment when needed Do not stand under overhanging load Do not use...

Страница 13: ...itable for connection to intrabuilding or unexposed wiring or cabling only The intrabuilding ports of this equipment must not be metallically connected to the interfaces that connect to the OSP outsid...

Страница 14: ...xiv Power Systems Installing the IBM Power System S922 9009 22A and 9009 22G IBM Power System H922 9223 22H or IBM Power System H922S 9223 22S...

Страница 15: ...e Planning for the system http www ibm com support knowledgecenter POWER9 p9had p9had_90x_kickoff htm If you are using a Hardware Management Console HMC see Update the Hardware Management Console http...

Страница 16: ...into the rack About this task To determine where to install the system unit into a rack complete the following steps Procedure 1 Read the Rack safety notices http www ibm com support knowledgecenter P...

Страница 17: ...est hole on the EIA unit directly above this EIA unit 6 Repeat step 5 on page 3 for the corresponding holes located on the left side of the rack 7 Go to the rear of the rack 8 On the right side find t...

Страница 18: ...thread support flange holes ensure that the rails and fittings match the support flange holes that are used on your rack Do not install mismatched hardware by using washers or spacers If you do not h...

Страница 19: ...vel the rail retention bracket out 3 and pull the front of the rail toward the front of the rack until the pins are aligned with the correct holes in the rack 4 Installing the IBM Power System S922 90...

Страница 20: ...and aligning the pins 4 Swivel the rail retention bracket so that it locks onto the rack flange 5 6 Power Systems Installing the IBM Power System S922 9009 22A and 9009 22G IBM Power System H922 9223...

Страница 21: ...ou use an ESD wrist strap follow all electrical safety procedures An ESD wrist strap is used for static control It does not increase or decrease your risk of receiving electric shock when using or wor...

Страница 22: ...lide the server down until the rear nail heads slip into the two rear slots Then slowly lower the front of the server 3 4 until the other nail heads slip into the other slots on the slide rails Ensure...

Страница 23: ...ure to install the cable management arm About this task To install the cable management arm complete the following steps Procedure 1 Ensure that you have the following parts Item Description A Inner c...

Страница 24: ...e it is illustrated that you are installing it on the right side while you are facing the server from the rear If you want to install the cable management arm on the other side of the rack you can pre...

Страница 25: ...damage when the system is placed in the service position ensure that the middle pin is between each arm Figure 10 Inserting the mounting brackets 4 On the opposite side of the rack insert the extensio...

Страница 26: ...er VIOS in one of your logical partitions Go to the instructions for the applicable console interface or terminal in the following table Table 1 Available console types Console type Operating system L...

Страница 27: ...If present remove and discard any plug that covers the ports on the rear of the system The port covers ensure that you are reminded about resetting the Administrator password of your managed system af...

Страница 28: ...use of capacity on demand Using service applications the HMC can also communicate with managed systems to detect consolidate and forward information to IBM service for analysis Before you begin If yo...

Страница 29: ...nsole can use it Note the Internet Protocol IP address subnet mask and default gateway Optionally select a unique host name and register the host name and the IP address in your site s Domain Name Sys...

Страница 30: ...settings and disable the firewall b In the Windows control panel click Security center Check for a firewall and if present disable it c Scan all tasks that are running on the PC for any other softwar...

Страница 31: ...ole d Ensure that the Find Console Near and Filter check boxes are not selected e Click Search A connection displays Click the connection and then click Console f In the Pending Authorization window t...

Страница 32: ...d mouse complete the following steps Procedure 1 Locate the graphics card and Universal Serial Bus USB ports at the rear of the system You might need a connector converter 2 Connect the monitor cable...

Страница 33: ...ate multiple workloads onto fewer systems to increase server use and to reduce cost Before you begin To manage POWER9 processor based systems the HMC must be at version 9 release 1 or later If your sy...

Страница 34: ...OK f Record the level that appears in the EC Number field and the Activated Level field For example if the EC Number is 01EM310 and the Activated Level is 77 the firmware level is 01EM310_77 6 Compar...

Страница 35: ...gecenter POWER9 p9hb1 p9hb1_vios_install htm Install the IBM i operating system For instructions see Installing the IBM i operating system http www ibm com support knowledgecenter POWER9 p9hdx p9hdx_i...

Страница 36: ...ll the VIOS operating system For instructions see Installing VIOS http www ibm com support knowledgecenter POWER9 p9hch p9hch_installvios htm Install the IBM i operating system For instructions see In...

Страница 37: ...ent Console HMC To manage POWER9 processor based systems the HMC must be at version 9 release 9 2 0 or later Graphic monitor with keyboard and mouse Teletype tty monitor with keyboard Completing inven...

Страница 38: ...d loop fasteners b Connect the system power cords from the server and I O drawers to the PDU with an IEC 320 type receptacle c Attach the PDU input power cord and plug it into the power source Cabling...

Страница 39: ...he following general attributes These attributes are the default settings for the diagnostic programs Be sure that your terminal is set according to these attributes before proceeding to the next step...

Страница 40: ...tions see HMC network connections http www ibm com support knowledgecenter POWER9 p9hai p9hai_netconhmc htm If you are using a switch ensure that the speed in the switch is set to Autodetection If the...

Страница 41: ...date multiple workloads onto fewer systems to increase server use and to reduce cost Before you begin To manage POWER9 processor based systems the HMC must be at version 9 release 9 2 0 or later About...

Страница 42: ...r Management c Select the power on options that you want to use and click OK 7 Create partitions using templates If you are creating new partitions you can use the templates that are on your HMC For m...

Страница 43: ...indicating that the system is powered on For instructions see Starting a system that is not managed by an HMC www ibm com support knowledgecenter POWER9 p9haj startsysnohmc htm 3 Control speculative...

Страница 44: ...wledgecenter POWER9 p9ha5 fix_firm_no_hmc_aix htm If you are using VIOS see Updating the Virtual I O Server http www ibm com support knowledgecenter POWER9 p9hb1 p9hb1_vios_managing_updating htm 6 You...

Страница 45: ...ct s and or the program s described in this publication at any time without notice Any references in this information to non IBM websites are provided for convenience only and do not in any manner ser...

Страница 46: ...ully Overview The IBM Power Systems servers include the following major accessibility features Keyboard only operation Operations that use a screen reader The IBM Power Systems servers use the latest...

Страница 47: ...set forth below This Software Offering does not use cookies or other technologies to collect personally identifiable information If the configurations deployed for this Software Offering provide you a...

Страница 48: ...ngleichung der Rechtsvorschriften ber die elektromagnetische Vertr glichkeit in den EU Mitgliedsstaatenund h lt die Grenzwerte der EN 55022 EN 55032 Klasse A ein Um dieses sicherzustellen sind die Ger...

Страница 49: ...relle Informationen Das Ger t erf llt die Schutzanforderungen nach EN 55024 und EN 55022 EN 55032 Klasse A Japan Electronics and Information Technology Industries Association JEITA Notice This stateme...

Страница 50: ...alled and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interferenc...

Страница 51: ...luding the fitting of non IBM option cards German Notice Deutschsprachiger EU Hinweis Hinweis f r Ger te der Klasse B EU Richtlinie zur Elektromagnetischen Vertr glichkeit Dieses Produkt entspricht de...

Страница 52: ...N 55032 Klasse B Japan Electronics and Information Technology Industries Association JEITA Notice This statement applies to products less than or equal to 20 A per phase This statement applies to prod...

Страница 53: ...or television interference caused by using other than recommended cables and connectors or by unauthorized changes or modifications to this equipment Unauthorized changes or modifications could void...

Страница 54: ...re not being properly followed You may not download export or re export this information except in full compliance with all applicable laws and regulations including all United States export laws and...

Страница 55: ......

Страница 56: ...IBM Part Number 03GM221 GI11 9931 04 1P P N 03GM221...

Отзывы: