• When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap is
used for static control. It does not increase or decrease your risk of receiving electric shock
when using or working on electrical equipment.
• If you do not have an ESD wrist strap, just prior to removing the product from ESD packaging and
installing or replacing hardware, touch an unpainted metal surface of the system for a minimum
of 5 seconds.
You might need to read the following documents before you begin to install the server:
• To plan your server installation, see Planning for the system (http://www.ibm.com/support/
knowledgecenter/POWER9/p9ia4/p9ia4_90x_kickoff.htm).
• If you are using a Hardware Management Console (HMC), see Update the Hardware Management
Console (http://www.ibm.com/support/knowledgecenter/POWER9/p9eh6/p9eh6_updatehmc.htm).
Consider the following prerequisites before you install the server:
Procedure
1. Ensure that you have the following items before you start your installation:
• Phillips screwdriver
• Flat-head screwdriver
2. Ensure that you have one of the following consoles:
• Hardware Management Console (HMC): To manage POWER9 processor-based systems, the HMC
must be at version 9 release 9.2.0, or later.
• Graphic monitor with keyboard and mouse.
• Teletype (tty) monitor with keyboard.
Completing inventory for your preinstalled server
Use this information to complete inventory for your server.
About this task
To complete the inventory, complete the following steps:
Procedure
1. Verify that you received all the boxes you ordered.
2. Unpack the server components as needed.
3. Complete a parts inventory before you install each server component by following these steps:
a. Locate the inventory list for your server.
b. Ensure that you received all the parts that you ordered.
Note: Your order information is included with your product. You can also obtain the order
information from your marketing representative or the IBM Business Partner.
If you have incorrect, missing, or damaged parts, consult any of the following resources:
• Your IBM reseller.
• IBM Rochester manufacturing automated information line at 1-800-300-8751 (United States
only).
• The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your
location to view the service and support contact information.
Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or
IBM Power System H922S (9223-22S) 23
Содержание S922
Страница 4: ...iv...
Страница 55: ......
Страница 56: ...IBM Part Number 03GM221 GI11 9931 04 1P P N 03GM221...