Figure 5. Locking the rail retention bracket onto the rack flange
5. Repeat these steps for the right rail.
Installing the system into the rack
Use the procedure to install the system into the rack.
About this task
Attention:
• Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack, or
to an unpainted metal surface of your hardware to prevent the electrostatic discharge from
damaging your hardware.
• When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap is
used for static control. It does not increase or decrease your risk of receiving electric shock
when using or working on electrical equipment.
• If you do not have an ESD wrist strap, just prior to removing the product from ESD packaging and
installing or replacing hardware, touch an unpainted metal surface of the system for a minimum
of 5 seconds.
CAUTION: This system requires three people to install the system into the rack.
Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or
IBM Power System H922S (9223-22S) 7
Содержание S922
Страница 4: ...iv...
Страница 55: ......
Страница 56: ...IBM Part Number 03GM221 GI11 9931 04 1P P N 03GM221...