4.
Install the screws on either side of the system to secure the system to the rack.
5.
Attach the front cover to the front of the system.
Installing the cable-management arm and connecting and routing
power cables
The cable-management arm is used to efficiently route cables so that you have proper access to the rear
of the system. After you have installed the cable-management arm, connect and route power cables.
2
P8EG1501-0
1
Figure 7. Lifting the release latches and pushing the server into the rack
Figure 8. The server installed in the rack
Installing the IBM Power System S822LC (8335-GTA and 8335-GCA)
7
Содержание S822LC
Страница 2: ......
Страница 16: ...xiv Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Страница 104: ...88 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Страница 122: ...106 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Страница 125: ...Figure 78 Connecting the power cord to the power supply Power supplies 109...
Страница 126: ...110 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Страница 138: ...122 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Страница 139: ......
Страница 140: ...IBM Printed in USA...