background image

 
 

MicroDC 

MicroDC 
Quick Installation Guide 

 

Issue: 

02 

Release Date: 

2014-04-25 

Product 

Huawei MicroDC implements centralized management of micro data centers in enterprise 
branch offices. This solution ensures that the micro data centers operate properly even in 
unattended mode, allowing customers to focus on core businesses and processes. 

Huawei MicroDC pre-integrates facilities, such as the cabinet cabling subsystem, power 
supply and distribution subsystem, and environment monitoring subsystem, and 
incorporates the ICT infrastructure, such as computing, storage, network, security, and 
voice communication resources. It implements unified, remote management of branch 
offices through an open software and hardware platform. 

MicroDC3000L 24U 

MicroDC3000H 42U 

Application Scenarios 
 

Small-scale branch offices 

MicroDC3000L (a 24 U c optional devices) 

Medium-sized branch offices  

MicroDC3000H (a 42 U c optional devices) 

 
The MicroDC features high scalability. Devices can be easily added 
to the cabinet based on service requirements. 
More MicroDC cabinets can also be added on demand. 

About This Document 

How to Obtain Help 

Feedback 

Before You Start 

This document describes how to install MicroDC hardware devices onsite. It does not include the installation of 

the devices preinstalled before delivery. For details about the installation for each device, see the documents 

delivered with the devices or obtain documents at 

http://enterprise.huawei.com

 based on the device model.  

You can view and download documents from 

http://enterprise.huawei.com

 after registering with this website. 

Your comments and suggestions help improve the accuracy and quality of our documentation. 
Visit 

http://enterprise.huawei.com

 to submit your comments and suggestions. 

Copyright 

Huawei Technologies Co., Ltd. 2014. All rights reserved. 

Summary of Contents for MicroDC3000H

Page 1: ...icroDC3000L a 24 U cabinet optional devices Medium sized branch offices MicroDC3000H a 42 U cabinet optional devices The MicroDC features high scalability Devices can be easily added to the cabinet based on service requirements More MicroDC cabinets can also be added on demand About This Document How to Obtain Help a b Feedback c Before You Start This document describes how to install MicroDC hard...

Page 2: ...nt ground it first When removing equipment disconnect grounding cables last Do not damage grounding conductors or operate the equipment without a grounding conductor Equipment must be permanently connected to the protection ground before an operation Before operating a device check the electrical connection of the device and ensure that the device is securely grounded Scenario 2 Wear an ESD wrist ...

Page 3: ...3 MicroDC3000L Quick Installation Guide Start Here ...

Page 4: ...ct them against the packing list delivered with the product If you need to inspect battery packs see the inspection method described in the document delivered with the battery packs P11 Mandatory Tools Adjustable wrench 6 Phillips screwdriver M5 M6 and M8 Flat head screwdriver 2 mm to 5 mm ESD gloves Measuring tape 5 m Electrical tester pen Diagonal pliers Optional Tools Right angle Level Impact t...

Page 5: ...E7 port of the AR1220 router installed on the 22 U position of the rack is connected to the port GE0 of the USG installed on the 18 U position of the rack To From To From Local device name Sequential number of the network cable Port number of the peer device Port number of the local device Peer device name 7 22U AR1220 FE7 18U USG GE0 9U CCU PDU B1 5 Label description The power cable on the No 5 s...

Page 6: ...TP SI AC S3700 28TP PWR EI S3700 52P SI AC S3700 52P PWR EI S2700 26TP EI AC S2700 26TP PWR EI S5700 28C PWR EI S5700 52C PWR SI S5700 28C SI S5700 52C SI USG2260 Uninterruptible power supply UPS Cabinet control unit CCU Battery pack ...

Page 7: ...7 AR1220 AR1220V AR1220W AR1220VW AR2220 RH2285 Filler panel Cable rack Cable tray Ground cable Adjustable guide rails Access point AP Dome camera AP power adapter PoE power adapter ...

Page 8: ...Server Aggregation switch KVM Cable tray Power supply distribution area Reserved area Network device area The CCU UPS and aggregation switch are mandatory Other devices are optional The CCU UPS aggregation switch and optional network devices are preinstalled before delivery Other devices are installed onsite Other components to be installed include the cameras integrated sensor mounting arm PoE po...

Page 9: ...til the leveling feet bear the whole cabinet weight Use an adjustable wrench to remove all screws from the front and rear doors of the cabinet Push the cabinet so that it rolls down the ramp attached to the pallet Two people are required to move the cabinet Use an adjustable wrench to remove the shim from the pallet Place the shim on the gap of the elevator door Ensure that the shim is securely pl...

Page 10: ...he leveling feet Open the front and rear doors Rotate the four leveling feet clockwise by using a Phillips screwdriver to lower the leveling feet Rotate the M12 bolts at the bottom of the leveling feet clockwise by using an adjustable wrench until the leveling feet contact the ground and the wheels hang in the air Ensure that the heights measured from the front rear right and left of the cabinet a...

Page 11: ...ne installation positions 2 Unpack battery packs Hold a claw hammer with one hand to support the cover and hold the screwdriver with the other hand to turn the cover upwards along the external side until the cover is removed from the body Insert a flat head screwdriver into the gap between the cover and body of the wooden crate and raise the cover upwards ...

Page 12: ...e on the other side of the filler panel with the other hand press the buckle with the middle finger and pull out the filler panel with proper force Use the floating nut installation bar to install the floating nuts on the tapped hole of the mounting bar inside the cabinet The figure on the right shows the positions of the floating nuts Installation method ...

Page 13: ...nd battery packs Insert the ground cables reserved on the ground bar into the binding posts of the three battery packs and fasten the screws Battery pack 1 Battery pack 2 Ground bar UPS Battery pack 1 Battery pack 2 Do not connect the plug on the right ...

Page 14: ...e filler panel with the other hand press the buckle with the middle finger and pull out the filler panel with proper force Place the guide rail horizontally at the planned position near the rack installation bar and hook the buckle Insert the rubber plugs delivered with the guide rails into the following square holes to fasten the guide rails Square hole at the front bottom of the guide rail Squar...

Page 15: ...the same as the server No ground cable is required because the RH2285 is configured with AC power modules 15 5 Connect power cables 6 Connect the switch and the server Find the network cables from the switch based on the labels and connect the network cables to the corresponding ports on the server RH2285H 9 9 10U Server 1 20U S5700 G09 Lable example ...

Page 16: ...anel with one hand and hold the buckle on the other side of the filler panel with the other hand press the buckle with the middle finger and pull out the filler panel with proper force Remove the shipping bracket from the KVM front panel Place the KVM on the guide rails from the front of the cabinet and slide it into the right position ...

Page 17: ...mounting ears to the mounting bars of the cabinet 4 Connect the KVM to the PDU 5 Connect the KVM to servers To facilitate subsequent maintenance connect the servers in the rack to the eight KVM ports numbered from P1 to P8 from the bottom up NOTE Connect the reserved power cable connector on the PDU to the KVM No ground cable is required because the KVM is configured with AC power modules ...

Page 18: ...onnector and secure the rotatable tube 2 NOTE Two people are required to install the integrated sensor mounting arm with the help of a step ladder Use an M5 Phillips screwdriver to secure self tapping screws for the integrated sensor mounting arm base Rotate tube 1 to adjust the sensor mounting arm until it is in the highest position Then adjust the camera based on the object to be monitored Tube ...

Page 19: ...pter on the 17 U cable rack at the rear of the cabinet 2 Insert the reserved PDU power plug near the cable rack to the power adapter 3 Connect the network cable of the camera to the Power Data out port on the PoE power adapter 4 Connect the network cable reserved for the switch near the cable rack to the Data in port 5 Secure the PoE power adapter using cable ties Connect the network cable to the ...

Page 20: ...e AP is connected to a switch with PoE function The AP obtains power by connecting to a network cable Connect the AP to the switch based on the network plan Connect the AP to the switch with the PoE function based on the network plan Network cable Power adapter Connecting the power adapter to a mains power socket Switch Network cable PoE switch ...

Page 21: ...bolts that are not properly secured 3 Switch on the circuit breaker on the battery pack Check that the voltage between the positive and negative terminals is greater than 96 V DC Switch off the circuit breaker on the battery pack after the test 4 Check that screws at the ground points of the battery packs are secured Fasten the screws that are not properly secured 1 Switch on and off all input cir...

Page 22: ...and the other end to the mains power socket WARNING Ground the equipment before powering it on Otherwise personal injury or equipment damage may be caused by high leakage current NOTE The power cable for a 24 U cabinet varies according to the port format MicroDCs provide a variety of power cable plugs to meet requirements in different countries Specifications of plugs provided by Huawei Parameter ...

Page 23: ...23 4b Performing Power On and Power Off Commissioning Power on process Power off process The hardware installation of the MicroDC3000L suite is complete For subsequent operations see Appendix ...

Page 24: ...24 MicroDC3000H Quick Installation Guide Start Here ...

Page 25: ...Electrician s knife Protective gloves Multimeter Powder marker Vertical analyzer 1a Obtaining Tools 1 Installation Preparations 25 NOTE Ensure that the mandatory tools are available before the installation The optional tools help increase installation efficiency 1b Checking Goods NOTE Check the goods according to the goods list delivered with the devices If there are packed components that require...

Page 26: ...stallation position of the local device Port number of the local device Peer device name Label description The No 7 network cable on the FE7 port of the AR1220 router installed on the 22 U position of the rack is connected to the port GE0 of the USG installed on the 18 U position of the rack To From To From 7 22U AR1220 FE7 18U USG GE0 9U CCU PDU B1 5 Label description The power cable on the No 5 ...

Page 27: ...Appearances 1d 27 S3700 28TP SI AC S3700 28TP PWR EI S3700 52P SI AC S3700 52P PWR EI S2700 26TP EI AC S2700 26TP PWR EI S5700 28C PWR EI S5700 52C PWR SI S5700 28C SI S5700 52C SI USG2260 UPS CCU Battery pack ...

Page 28: ...8 AR1220 AR1220V AR1220W AR1220VW AR2220 AR2240 RH2285 Power distribution box PDB Cable tray Filler panel Adjustable guide rails Cable rack Dome camera Ground cable PoE power adapter AP AP power adapter ...

Page 29: ...ble tray Power supply distribution area Reserved area Network device area Filler panel 1 U Router Cable tray Cable tray Cable tray Access switch Filler panel 1 U Storage device 2 U The CCU UPS PDB and aggregation switch are mandatory Other devices are optional The CCU UPS PDB aggregation switch and optional network devices are preinstalled before delivery Other devices are installed onsite Servers...

Page 30: ...r supporting feet of the cabinet anticlockwise until the leveling feet bear the whole cabinet weight Use an adjustable wrench to remove all screws from the front and rear doors of the cabinet Push the cabinet The wheeled cabinet can be easily moved down from the pallet Two people are required to move the cabinet Use an adjustable wrench to remove the shim from the pallet Place the shim on the gap ...

Page 31: ...feet clockwise by using an adjustable wrench until the leveling feet contact the ground and the wheels hang in the air Ensure that the heights measured from the front rear right and left of the cabinet are the same Spin the wheels by using a Phillips screwdriver If the wheels rotate freely they are hanging in the air H indicates the distance from the cabinet top to the ground The cabinet height ca...

Page 32: ...using a Phillips screwdriver Pass the connecting plate through the gap on the cabinet door and secure it using the screws removed during step 1 The figure on the right shows that the cabinets are combined using connecting plates There are four connecting points on the front door and rear door of the middle cabinets There are two connecting points on the front door and rear door of the side cabinet...

Page 33: ...n the position of battery pack 1 If two battery packs are required place them in the positions of battery pack 1 and battery pack 1 Determine installation positions Use the floating nut installation bar to install the floating nuts on the tapped hole of the mounting bar inside the cabinet The figure on the right shows the positions of the floating nuts Installation method 2 Install floating nuts I...

Page 34: ...ng battery packs using mounting ears front panels and wiring terminal covers is prohibited When moving heavy objects follow the standardized operation 2 When moving battery packs take off metal ornaments such as watches and rings DANGER The rack must be grounded before you perform this operation Do not touch non insulated battery wiring terminals 4 Install battery packs in the rack ...

Page 35: ...the ports on the UPS and battery packs using a Phillips screwdriver Connect the UPS and battery packs and secure the connectors using a screwdriver as shown in the following figure 6 Install filler panels After installing all battery packs on the shelf in the cabinet and connecting cables to them install filler panels on each battery pack ...

Page 36: ... rail horizontally at the planned position near the rack installation bar and hook the buckle Insert an M6 screw to the first square hole at the rear of the guide rail and fasten the M6 screw Use the same method to install the guide rail on the other side of the server Insert the rubber plugs delivered with the guide rails into the following square holes to fasten the guide rails Square hole at th...

Page 37: ... to the corresponding ports on the server NOTE Connect the two reserved power cable connectors on the PDU to the server based on labels Make sure that the installation position on the label is the same as the server No ground cable is required because the RH2285 is configured with AC power modules RH2285H 5 21 22U Server 1 M 37U S5700 G05 Lable example ...

Page 38: ...with one hand and hold the buckle on the other side of the filler panel with the other hand press the buckle with the middle finger and pull out the filler panel with proper force Remove the shipping bracket from the KVM front panel Put the KVM on the guide rails through the front of the cabinet as planned and slide it to the right position ...

Page 39: ...ounting ears to the mounting bars of the cabinet 4 Connect the KVM to the PDU 5 Connect the KVM to servers Servers in the rack are connected to the eight KVM ports numbered from P1 to P8 from the bottom up to facilitate subsequent maintenance NOTE Connect the reserved power cable connector on the PDU to the KVM No ground cable is required because the KVM is configured with AC power modules ...

Page 40: ...onnector and secure the rotatable tube 2 Tube 1 Tube 2 Camera Smoke sensor Adjustable connector NOTE Two people are required to install the integrated sensor mounting arm with the help of a step ladder Use an M5 Phillips screwdriver to secure self tapping screws for the integrated sensor mounting arm base Rotate tube 1 to adjust the sensor mounting arm until it is in the highest position Then adju...

Page 41: ...pter on the 17 U cable rack at the rear of the cabinet 2 Insert the reserved PDU power plug near the cable rack to the power adapter 3 Connect the network cable of the camera to the Power Data out port on the PoE power adapter 4 Connect the network cable reserved for the switch near the cable rack to the Data in port 5 Secure the PoE power adapter using cable ties Connect the network cable to the ...

Page 42: ...e AP is connected to a switch with PoE function The AP obtains power by connecting to a network cable Connect the AP to the switch based on the network plan Connect the AP to the switch with the PoE function based on the network plan Network cable Power adapter Connecting the power adapter to a mains power socket Switch Network cable PoE switch ...

Page 43: ...tch off the surge protective circuit breaker QF2 2 Check that the insulation resistance between the L terminal and the PE terminal on the PDB is greater than or equal to 2 MΩ 3 Check that the insulation resistance between the N terminal and the PE terminal on the PDB is greater than or equal to 2 MΩ Checking the UPS 3b 1 Switch on and off all input circuit breakers three times Ensure that they can...

Page 44: ...vised to test the insulation performance together with the onsite electricians 3 Check that screws at the ground points of the battery packs are secured 1 Switch on and off all circuit breakers three times Ensure that they can be switched on and off smoothly 2 Check that all bolts are secured for cables Fasten the bolts that are not properly secured 3c Commissioning Battery Packs Checking the PDU ...

Page 45: ...nt 32 A Input circuit breaker 32 A 1 P Connect with an industrial connector complying with IEC standards Electrical specifications for the external mains power distribution system Connect to the mains power system If the industrial connector fails to route through the cable hole at the top of the cabinet pull the two positioning pins at the top of the cabinet inwards simultaneously with both hands...

Page 46: ... pressing sheet of component 3 at the position of screw B Fasten screw B to secure the cables fix component 3 into component 2 and fasten screw A and component 1 Connect the industrial connector to the industrial socket until the industrial connector is firmly seated in the slot at the middle of the industrial socket at the position of D as shown in the figure on the right Component 1 Component 2 ...

Page 47: ...te environment The hardware installation of the MicroDC3000H suite is complete For subsequent operations see Appendix For details see Starting and Stopping the UPS in Appendix B P49 Loads refer to power consuming devices such as switches and routers For details see Starting and Stopping the UPS in Appendix B P49 ...

Page 48: ...t http enterprise huawei com Product Support Cloud Computing Data Centers Data Center MicroDC MicroDC Rapid Deployment 1 Install the MySQL database 2 Install the rapid deployment tool 3 Log in to the rapid deployment tool and perform rapid deployment For details see the MicroDC V100R001C20 Rapid Deployment Guide You can obtain the MicroDC V100R001C20 Rapid Deployment Guide from DVD ROM delivered w...

Page 49: ...n is displayed The UPS enters the bypass mode with buzzes Symbol Description Remarks Choose A A and B indicate the operators on the UPS control panel Choose A and then B Some screens are omitted between the two screens at both ends of the sign None A A B Symbol description 1 Starting the UPS Start the UPS On the main screen press to go to the main menu Choose Control Startup to start the UPS The U...

Page 50: ...o the main menu and choose Shutdown The UPS switches to the bypass mode with buzzes Switch off all the switches on the UPS backplane The UPS stops buzzing If all the indicators are off and the fans stops running the UPS stops 2 Stopping the UPS Observe the indicators on the UPS panel If the indicators 1 and 4 are steady green the UPS starts properly 1 2 3 4 ...

Reviews: