background image

Warnings!

 

15kg

30kg

50kg

Please keep this document for future reference.

If the device is more than 15kg, at least 2 people are needed.

If the device is more than 30kg, at least 3 people are needed.

If the device is more than 50kg, at least 4 people are needed.

The cabinet, chassis or guide rails may cause serious scratches, 
please be careful while handling.
When  installing  new  servers  into  the  cabinet  in  use,  please  be 
aware of electric shock.

V01502B000000000

Rack-Mounted Server

Installation Guide

V1.0

 During the installation process, please do not block the vents on the server, especially the 

vents on the front and rear of the server.

 Please remove the protective film from the server surface before using.

 Please leave a minimum of 15cm clearance on the front and rear sides of the server for 

proper ventilation.

 Please install air baffles in place prior to device installation, to make sure that the server can 

get enough air flow, and to avoid air turbulence in the server room.

 Servers are high-power electrical appliances, and they should be installed into dedicated 

cabinets with vents or professional water-cooled cabinets, to prevent system failures 
caused by overheating.

 If it needs to install more than one device, please load them from the bottom to the top, 

and load the heaviest items first.

 Please note the cabinet’s load-bearing capacity, power supply capacity and heat 

dissipation capacity, be sure not to install devices beyond the cabinet’s threshold capacity.

 For the convenience of using the front and rear ports of the server and cabling, leave a 

minimum clearance of 70mm between the front end of the server and the inner side of the 
cabinet’s front door, and 150mm between the rear end of the server and the inner side of 
the cabinet’s rear door.

Reviews: