![background image](http://html2.mh-extra.com/html/ibm/s822lc/s822lc_installing-the-system-and-ordered-parts_3362741027.webp)
7.
Place the cable-management arm (D) on the support arm (A). Slide the first cable-management arm
tab into the slot on the mounting bracket (C). Push the tab until the spring-loaded latch snaps into
place. Slide the other cable-management arm tab into the extension bracket (E) on the outside of the
right slide rail (2). Push the tab until the spring-loaded latch snaps into place. For details, see
Figure 15 and Figure 16 on page 12.
Figure 14. Installing the mounting bracket into the slide rail
P7EF3502-2
1
D
A
C
Figure 15. Sliding the cable-management arm tab into the mounting bracket slot
Installing the IBM Power System S822LC (8335-GTA and 8335-GCA)
11
Содержание S822LC
Страница 2: ......
Страница 16: ...xiv Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Страница 104: ...88 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Страница 122: ...106 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Страница 125: ...Figure 78 Connecting the power cord to the power supply Power supplies 109...
Страница 126: ...110 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Страница 138: ...122 Installing the System and Ordered Parts for the 8335 GCA or 8335 GTA...
Страница 139: ......
Страница 140: ...IBM Printed in USA...