7. Connect all the cables.
8. Initialize the switch, see Chapter 4, “Initializing the RackSwitch,” on page 45.
Attention:
If this is a switch replacement, make sure that the vital product
data (VPD) is updated to avoid losing the licensed electronic entitlement data of
the RackSwitch. For more information, see “Configuring Vital Product Data after
a switch replacement” on page 43.
Installing the 1U air duct option
The RackSwitch supports an optional 1U air duct to maximize air flow conditions in
a 19" rack. For 1U air duct option part numbers, see the Chapter 6, “Replaceable
switch parts,” on page 53 section.
Mounting kit components
The 1U air duct option ships with:
v
One 1U air duct unit
v
One 1U air duct mechanical assembly kit
v
One power cord
1
7
The following table lists the parts included with the 1U air duct mounting kit.
Table 18. 1U air duct mounting kit
Item number
Description
Quantity
1
Cable tie
4
2
1U Duct sleeve (long)
1
3
Mounting bracket, right,
assembly, 1U duct
1
4
Mounting bracket, left,
assembly, 1U duct
1
5
Foam carrier assembly,
includes half shears and
foam carrier
2
28
IBM System Networking RackSwitch G8000: Installation Guide
Содержание RackSwitch G8000
Страница 1: ...IBM System Networking RackSwitch G8000 Installation Guide...
Страница 2: ......
Страница 3: ...IBM System Networking RackSwitch G8000 Installation Guide...
Страница 14: ...xii IBM System Networking RackSwitch G8000 Installation Guide...
Страница 52: ...36 IBM System Networking RackSwitch G8000 Installation Guide...
Страница 66: ...50 IBM System Networking RackSwitch G8000 Installation Guide...
Страница 68: ...52 IBM System Networking RackSwitch G8000 Installation Guide...
Страница 82: ...66 IBM System Networking RackSwitch G8000 Installation Guide...
Страница 85: ......
Страница 86: ...Part Number 00AY391 Printed in USA 1P P N 00AY391...