background image

 

 

 

JURISDICTION TO JURISDICTION. SOME JURISDICTIONS DO NOT ALLOW THE EXCLUSION OR LIMITATION
OF EXPRESS OR IMPLIED WARRANTIES, SO THE ABOVE EXCLUSION OR LIMITATION MAY NOT APPLY TO
YOU. IN THAT EVENT, SUCH WARRANTIES ARE LIMITED IN DURATION TO THE WARRANTY PERIOD. NO
WARRANTIES APPLY AFTER THAT PERIOD.

Items Not Covered by Warranty

IBM does not warrant uninterrupted or error-free operation of a Machine.

Unless specified otherwise, IBM provides non-IBM machines

WITHOUT WARRANTIES OF ANY KIND.

Any technical or other support provided for a Machine under warranty, such as assistance via telephone with “how-to” questions and

those regarding Machine set-up and installation, will be provided

WITHOUT WARRANTIES OF ANY KIND.

Warranty Service

To obtain warranty service for the Machine, contact your reseller or IBM. In the United States, call IBM at 1-800-772-2227. In
Canada, call IBM at 1-800-565-3344. (In Toronto, call 416-383-3344.) You may be required to present proof of purchase.

IBM or your reseller provides certain types of repair and exchange service, either at your location or at a service center, to keep
Machines in, or restore them to, conformance with their Specifications. IBM or your reseller will inform you of the available types of
service for a Machine based on its country of installation. IBM may repair the failing Machine or exchange it at its discretion.

When warranty service involves the exchange of a Machine or part, the item IBM or your reseller replaces becomes its property and
the replacement becomes yours. You represent that all removed items are genuine and unaltered. The replacement may not be
new, but will be in good working order and at least functionally equivalent to the item replaced. The replacement assumes the
warranty service status of the replaced item.

Any feature, conversion, or upgrade IBM or your reseller services must be installed on a Machine which is 1) for certain Machines,
the designated, serial-numbered Machine and 2) at an engineering-change level compatible with the feature, conversion, or upgrade.
Many features, conversions, or upgrades involve the removal of parts and their return to IBM. A part that replaces a removed part
will assume the warranty service status of the removed part.

Before IBM or your reseller exchanges a Machine or part, you agree to remove all features, parts, options, alterations, and
attachments not under warranty service.

You also agree to

1. ensure that the Machine is free of any legal obligations or restrictions that prevent its exchange;
2. obtain authorization from the owner to have IBM or your reseller service a Machine that you do not own; and
3. where applicable, before service is provided

a. follow the problem determination, problem analysis, and service request procedures that IBM or your reseller provides,
b. secure all programs, data, and funds contained in a Machine,

c. provide IBM or your reseller with sufficient, free, and safe access to your facilities to permit them to fulfill their obligations,

and

d. inform IBM or your reseller of changes in a Machine's location.

IBM is responsible for loss of, or damage to, your Machine while it is 1) in IBM's possession or 2) in transit in those cases where IBM
is responsible for the transportation charges.

Neither IBM nor your reseller is responsible for any of your confidential, proprietary or personal information contained in a Machine
which you return to IBM or your reseller for any reason. You should remove all such information from the Machine prior to its return.

Production Status

Each IBM Machine is manufactured from new parts, or new and used parts. In some cases, the Machine may not be new and may
have been previously installed. Regardless of the Machine's production status, IBM's appropriate warranty terms apply.

Limitation of Liability

Circumstances may arise where, because of a default on IBM's part or other liability, you are entitled to recover damages from IBM.
In each such instance, regardless of the basis on which you are entitled to claim damages from IBM (including fundamental breach,
negligence, misrepresentation, or other contract or tort claim), IBM is liable for no more than

1. damages for bodily injury (including death) and damage to real property and tangible personal property; and

2. the amount of any other actual direct damages, up to the greater of U.S. $100,000 (or equivalent in local currency) or the

charges (if recurring, 12 months' charges apply) for the Machine that is the subject of the claim.

This limit also applies to IBM's suppliers and your reseller. It is the maximum for which IBM, its suppliers, and your reseller are
collectively responsible.

   

Product warranties and notices

23

Содержание Netfinity 5Ux24D Tower-to-Rack Kit

Страница 1: ...IBM IBM Netfinity 5Ux24D Tower to Rack Kit Installation Instructions ...

Страница 2: ......

Страница 3: ...IBM IBM Netfinity 5Ux24D Tower to Rack Kit Installation Instructions ...

Страница 4: ...periodically made to the information herein these changes will be incorporated in new editions of the publication IBM may make improvements and or changes in the product s and or the program s described in this publication at any time This publication was developed for products and services offered in the United States of America IBM may not offer the products services or features discussed in thi...

Страница 5: ...00 setup utility diskette 20 Getting help service and information 21 Product warranties and notices 22 Warranty Statements 22 IBM Statement of Limited Warranty for United States Puerto Rico and Canada Part 1 General Terms 22 IBM Statement of Warranty Worldwide except Canada Puerto Rico Turkey United States Part 1 General Terms 24 Part 2 Worldwide Country Unique Terms 26 Notices 28 Trademarks 28 Co...

Страница 6: ...rd 9 12 Routing the LED panel cable 10 13 Installing the LED panel in the new location 10 14 Repositioning the non hot swap drives 11 15 Installing the release latch bracket assemblies 12 16 Installing the new bezel 12 17 Installing the top cover 13 18 Installing the rack support wheels 13 19 Locating cage nuts or clip nuts on the front and rear of a rack cabinet 15 20 Installing the slide rails 1...

Страница 7: ...nes de sécurité Vor der Installation dieses Produkts die Sicherheitshinweise lesen Prima di installare questo prodotto leggere le Informazioni sulla Sicurezza Lees voordat u dit product installeert eerst de veiligheidsvoorschriften Les sikkerhetsinformasjonen Safety Information før du installerer dette produktet Antes de instalar este produto leia as Informações sobre Segurança Pred inštaláciou to...

Страница 8: ...vi 5Ux24D Tower to Rack Kit Installation Instructions ...

Страница 9: ...le management arm One hinge bracket Four hinge pins One LED panel cable required for some servers Cable straps Miscellaneous hardware kit includes screws cage nuts and clip nuts to install the server in a rack cabinet IBM Safety Information booklet One rack installation template One or more system specific service labels One IBM Netfinity 5600 Hot Plug SCSI Setup Utility diskette This documentatio...

Страница 10: ...ow the instructions in Preparing the server for rack installation on page 3 to prepare your server 2 Follow the instructions in Installing the server in a rack cabinet on page 14 to install your server 3 Attach all cables and neatly route them before turning on your server 2 5Ux24D Tower to Rack Kit Installation Instructions ...

Страница 11: ...ment that will be attached to this product When possible use one hand only to connect or disconnect signal cables Never turn on any equipment when there is evidence of fire water or structural damage Disconnect the attached power cords telecommunications systems networks and modems before you open the device covers unless instructed otherwise in the installation and configuration procedures Connec...

Страница 12: ...and store the door for potential future use CP U VR M ME MO RY HD D PC I BU S NM I SM I SE RV IC E PR OC ES SO R BU S NO N RE DU ND AN T PO WE R SU PP LY 1 2 3 A B 1 2 3 FA N TE MP ER AT UR E Figure 1 Removing the server door 8 Remove the left side cover as shown below a Locate the release lever A on the front of the server and slide it to the right B A Figure 2 Removing the left side cover b Slid...

Страница 13: ... openings on the bottom of the server to remove the bezel from the server Store the bezel for potential future use 10 Remove the right side cover as shown below a From the rear of the server remove the four screws B that hold the cover A in place B A Figure 4 Removing the right side cover b Slide the cover toward the rear of the server about 25 mm 1 in then lift the cover away from the server and ...

Страница 14: ...stall the other one later as the server top cover b Align the bottom cover A with the frame of the server then slide the cover toward the front of the server making sure that the tabs on the rear of the cover fit into the slots on the rear of the server c Secure the bottom cover in place with the two screws B that come with this kit 12 Carefully turn the server top side up on a flat surface then r...

Страница 15: ...ch drive as you remove them b Remove the power switch panel A by pressing down and inward on the top blue tab c Align the panel with its new location B from the inside of the server then place the square end of the power switch panel into the bottom opening d Press the other end of the power switch panel toward the front of the server until it snaps into place 14 Press firmly on the bottom of the ...

Страница 16: ...ea then release the cable from the cable clip on the right side of the server e If your LED panel cable is long enough to reach the new position for the LED panel assembly skip to step 17 on page 10 to continue the installation otherwise you must replace the existing LED panel cable with the longer one that comes with this kit f Disconnect the cables that plug into J8 E and J10 A on the processor ...

Страница 17: ... Skip to step 17 on page 10 to continue the installation 16 For Netfinity 5100 servers you must disconnect the other end of the cable from the system board connector C D C B A Figure 11 Locating the LED panel cable connector on the system board Note The microprocessor connectors A main power connector B and DIMM sockets D are shown to assist you in locating the LED panel cable connector C Pull the...

Страница 18: ... panel assembly in step 15 on page 8 reassemble as follows a Push the LED cable connector through the opening in the LED panel bracket b Connect the LED cable to the LED panel c Reassemble the LED panel and bracket with the two screws that you removed earlier 19 Place the notched end of the LED panel bracket into the opening B aligning the LEDs so that they show through the holes in the server fro...

Страница 19: ...ROM drive and any other drives or filler panels in the non hot swap drive bays for rack operation by removing and rotating them as follows Figure 14 Repositioning the non hot swap drives a Unlatch the side releases for each drive or filler panel then pull the drives or filler panel out of the server b Reposition the drives so that they are top side up and horizontal then insert the drives into the...

Страница 20: ...th an L b Push the bracket up until the holes in the bracket align with the holes in the side of the server then secure the bracket with two M3 5 screws c Use the above steps to install the right side release latch bracket assembly 25 To install the new bezel that comes with this kit align the tabs on the back of the bezel with the tab openings on the front of the server then swing the bezel towar...

Страница 21: ...it toward the front of the server until the cover snaps into place Note Ensure that the tabs on the back of the cover fit into the slots on the back of the server Be sure that the front edge of the server is flat against the server 27 Attach the rack support wheels A to the sides of the server near the rear of the server A Figure 18 Installing the rack support wheels Proceed with Installing the se...

Страница 22: ...ts The server should always be connected to a properly grounded outlet Use the following basic steps to install your server in a rack cabinet 1 Refer to your server and rack documentation for detailed installation information Note Removing rack doors and side panels makes it easier to install the server 2 Use the rack installation template that comes with the 5Ux24D Tower to Rack Kit to mark the h...

Страница 23: ...D C B A Front Rear Figure 19 Locating cage nuts or clip nuts on the front and rear of a rack cabinet Installing the server in a rack cabinet 15 ...

Страница 24: ...h the installation 4 Install the cable management arm assembly B A Figure 21 Assembling and installing the cable management arms a Secure the hinge bracket A to the right rear of the rack below the slide rail with two M6 screws b Connect the other end of the cable management arm assembly to the right slide rail with one hinge pin B Note You must position the cable management arms as shown in figur...

Страница 25: ... 6 Lift the server above the slide rails then rest the rack support wheels A on the rear of the slide rails 18 kg 37 lbs 32 kg 70 5 lbs 55 kg 121 2 lbs C B A Figure 22 Placing the server on the slide rails Carefully lower the front of the server onto the slide rails Note Be sure that the bracket notches B on the front of the server fit securely on the tabs C located on the front of the slide rails...

Страница 26: ...l future use A Figure 23 Securing the server to the rails 8 Connect all server and device cables then route them along the cable management arm assembly and secure them to the arm with the cable straps A that come with the 5Ux24D Tower to Rack Kit A Figure 24 Routing server cables 18 5Ux24D Tower to Rack Kit Installation Instructions ...

Страница 27: ...server configuration program to reconfigure the server for the new rack orientation as shown below a Press the power control button to turn on the server and watch the display for the Press F1 for Configuration Setup and Press F2 for Diagnostics messages to appear then press F1 b Select System Information then select Product Data c Change the machine type and model from a tower model to a rack mod...

Страница 28: ...er steps in this installation procedure before running the utility The utility on the diskette starts automatically and updates the drive order of the SCSI IDs A progress indicator displays during both stages of the utility up to three minutes followed by a message that indicates successful or unsuccessful completion of the utility If the utility did not complete successfully restart the server to...

Страница 29: ...e to obtain warranty service Refer to the IBM hardware warranty for a full explanation of IBM s warranty terms Please have the following information ready when you call Machine Type and Model Serial numbers of your IBM hardware products Description of the problem Exact wording of any error messages Hardware and software configuration information On the World Wide Web the IBM Personal Computing Web...

Страница 30: ... for warranty service information Some IBM Machines are eligible for On site warranty service depending on the country where service is performed The IBM Warranty for Machines IBM warrants that each Machine 1 is free from defects in materials and workmanship and 2 conforms to IBM s Official Published Specifications The warranty period for a Machine is a specified fixed period commencing on its Dat...

Страница 31: ...emoved part Before IBM or your reseller exchanges a Machine or part you agree to remove all features parts options alterations and attachments not under warranty service You also agree to 1 ensure that the Machine is free of any legal obligations or restrictions that prevent its exchange 2 obtain authorization from the owner to have IBM or your reseller service a Machine that you do not own and 3 ...

Страница 32: ...e of Installation The date on your sales receipt is the Date of Installation unless IBM or your reseller informs you otherwise During the warranty period IBM or your reseller if approved by IBM to provide warranty service will provide repair and exchange service for the Machine without charge under the type of service designated for the Machine and will manage and install engineering changes that ...

Страница 33: ... to your facilities to permit them to fulfil their obligations and d inform IBM or your reseller of changes in a Machine s location IBM is responsible for loss of or damage to your Machine while it is 1 in IBM s possession or 2 in transit in those cases where IBM is responsible for the transportation charges Neither IBM nor your reseller is responsible for any of your confidential proprietary or p...

Страница 34: ...t 1993 or other legislation which cannot be excluded or limited The Consumer Guarantees Act 1993 will not apply in respect of any goods which IBM provides if you require the goods for the purposes of a business as defined in that Act Limitation of Liability The following is added to this Section Where Machines are not acquired for the purposes of a business as defined in the Consumer Guarantees Ac...

Страница 35: ...t as expressly provided in these terms and conditions all statutory conditions including all warranties implied but without prejudice to the generality of the foregoing all warranties implied by the Sale of Goods Act 1893 or the Sale of Goods and Supply of Services Act 1980 are hereby excluded Limitation of Liability The following replaces items one and two of the first paragraph of this Section 1...

Страница 36: ...4 In Toronto call 416 383 3344 UNITED STATES OF AMERICA Warranty Service The following is added to this Section To obtain warranty service from IBM call 1 800 772 2227 Notices References in this publication to IBM products programs or services do not imply that IBM intends to make these available in all countries in which IBM operates Any reference to an IBM product program or service is not inten...

Страница 37: ......

Страница 38: ...IBM Part Number 19K0825 Printed in U S A 19K 825 ...

Отзывы: