background image

IBM System Storage

N3400 Installation and Setup Instructions

GC27-2279-02

Содержание N3400

Страница 1: ...IBM System Storage N3400 Installation and Setup Instructions GC27 2279 02...

Страница 2: ...Business Machines Corporation in the United States other countries or both A complete and current list of other IBM trademarks is available on the web at www ibm com legal copytrade shtml Data ONTAP N...

Страница 3: ...EXN4000 or EXN1000 storage expansion unit shelf IDs 7 Attaching the cable management arms 7 Connecting the N3400 to a network 8 Connecting the N3400 to storage expansion units 9 Cabling a single node...

Страница 4: ...iv...

Страница 5: ...amily this functionality is referred to as a high availability HA configuration or an HA pair About this document This document provides installation and setup instructions for the IBM System Storage...

Страница 6: ...llation v Ethernet LAN cables v Fibre Channel FC cables v Console for example a PC or laptop v 2 Phillips screwdriver and slotted screwdriver v Pointed tool for setting termination and ID switches Imp...

Страница 7: ...for a list of contents for specific models v Small Form Factor Pluggable SFP modules are either in the accessory box or are installed in the fiber ports of the system unit 18 32 kg 39 7 70 5 lbs svc00...

Страница 8: ...rap 2 power cords 1 publications CD 1 or more envelopes with the software EULA and license keys 1 rack mount kit optional 3 Remove the foam hardware protectors and the plastic surrounding the system I...

Страница 9: ...specified on its label v Always install the storage expansion units fully loaded Do not remove disk drives to reduce the weight 1 Loosen but do not remove the four rail adjustment screws on each rail...

Страница 10: ...0 and 68 lb It takes two persons to safely lift this part or unit 1 If attached carefully remove the front bezel of the N3400 by pulling out on the rectangular openings marked by blue stripes on eithe...

Страница 11: ...ead screws as shown in Figure 5 The tie down plate should fit over the rear of the system unit 6 Any storage expansion units should be installed in the rack Refer to the Installation and Setup Instruc...

Страница 12: ...anged Setting SAS expansion unit shelf IDs A unique shelf ID from 01 to 98 is required for each SAS storage expansion unit in a SAS stack Visually verify that the shelf ID for each SAS storage expansi...

Страница 13: ...nit To adjust the storage expansion unit shelf ID press the or buttons Note This illustration shows a detailed view of the EXN4000 The shelf ID buttons on the EXN1000 are in the same relative position...

Страница 14: ...null modem cable to your console then connect the other end to the DB 9 end of the adapter 3 Connect your system to the network by plugging the network cables into the networking ports labeled e0a and...

Страница 15: ...nfiguring for initiator mode in the N3300 N3400 and N3600 Hardware and Service Guide for more information v SFPs must be used when connecting fiber cables v If you are connecting your configuration to...

Страница 16: ...t two storage expansion units in a loop The number of storage expansion units per loop might be different for your configuration 1 Cable the N3400 port 0a to the first expansion unit module A ESH2 ESH...

Страница 17: ...EXN2000 EXN4000 v Figure 10 shows only the first two storage expansion units in a loop The number of storage expansion units per loop might be different for your configuration 1 Cable the N3400 CM A p...

Страница 18: ...annel Cabling feature and or additional fiber cables and SFP Gigabit Interface Converters GBICs to implement this feature Dual path Fibre Channel cabling only applies to high availability active activ...

Страница 19: ...el cable from the FC OUT port on the lower controller B of the last disk storage expansion unit of the loop to FC port 0b of the upper processor controller module CM A of the N3400 See 4 in Figure 12...

Страница 20: ...ae0be0ce0d 0a 0b 10101e0P e0ae0be0ce0d N3400 SAS SAS PSU PSU IN OUT IN OUT EXN n340016 Figure 13 Cabling to the Fibre Channel switch PSU PSU IN OUT IN OUT EXN PSU PSU Controller Module B 0a 0b 10101e0...

Страница 21: ...the square port on the Input Output Module A IOM A of the first SAS storage expansion unit Note The SAS ports and Alternate Control Path ACP ports on the SAS storage expansion unit IOMs are designated...

Страница 22: ...r For more details about ACP see the IBM System Storage N series Universal SAS and ACP Cabling Guide PSU PSU Controller Module B 0a 0b 10101e0P e0ae0b e0c e0d 0a 0b 10101e0P e0ae0b e0c e0d N3400 SAS S...

Страница 23: ...that are being installed using power cord retainer clips as shown in Figure 15 3 Connect the power cords to the power sources making sure that the two power supplies are connected to separate and inde...

Страница 24: ...he battery is not charged enough to hold the NVMEM contents for a sufficient period the boot process is stopped until the battery is properly recharged However you can resume booting by following the...

Страница 25: ...nd ready to operate To complete the initial setup of a dual node N3400 continue to the next step 9 Enable clustering by entering the following command on one node s console cf enable 10 Check each nod...

Страница 26: ...20...

Страница 27: ...00 2 Gb EXN2000 2 Gb EXN4000 4 Gb or 2 Gb as necessary EXN2000s and EXN4000s mixed in the same loop 2 Gb Note SAS storage expansion units do not have speed switches 7 Check disk ownership a Make sure...

Страница 28: ...ONTAP Software Setup Guide Configuring and managing the iSCSI or FC protocol and creating and managing LUNs and initiator groups with the iSCSI or FC service Data ONTAP Block Access Management Guide...

Страница 29: ......

Страница 30: ...Part Number 46X9913 Printed in USA GC27 2279 02 1P P N 46X9913...

Отзывы: