Configure Ring Indicate Power On Policy
Note: This service aid runs on CHRP system units only.
This service aid allows the user to power-on a system by telephone from a remote
location. If the system is powered off, and Ring Indicate Power On is enabled, the
system powers on at a predetermined number of rings. If the system is already on, no
action is taken. In either case, the telephone call is not answered, and the caller
receives no feedback that the system has powered on.
Use this service aid to display and change the following settings for the Ring Indicate
Power On Policy.
Note: Some of the following settings may not be displayed by this service aid.
v
Power On Via Ring Indicate (on/off)
v
Number of Rings until Power On
You can access this service aid directly from the AIX command line by typing:
/usr/lpp/diagnostics/bin/uspchrp -r
Configure Surveillance Policy
This service aid monitors the system for hang conditions; that is, hardware or software
failures that cause operating system inactivity. When enabled, and surveillance detects
operating system inactivity, a call is placed to report the failure.
Use this service aid to display and change the following settings for the Surveillance
Policy.
Note: Some of the following settings may not be displayed by this service aid.
v
Surveillance (on/off)
v
Surveillance Time Interval
Maximum time between heartbeats from the operating system.
v
Surveillance Time Delay
Time to delay between when the operating system is in control and when to begin
operating system surveillance.
v
Changes are to take effect immediately
Set this to Yes if the changes made to the settings in this menu are to take place
immediately. Otherwise, the changes take effect beginning with the next system boot.
You can access this service aid directly from the AIX command line by entering:
/usr/lpp/diagnostics/bin/uspchrp -s
Chapter 6. Introducing Tasks and Service Aids
111
Содержание Intellistation POWER 9112 265
Страница 1: ...Intellistation POWER 9112 Model 265 User s Guide SA38 0608 00 IBM...
Страница 2: ......
Страница 3: ...Intellistation POWER 9112 Model 265 User s Guide SA38 0608 00 IBM...
Страница 11: ...Sample File modem_f cfg 189 Sample File modem_f0 cfg 192 Sample File modem_f1 cfg 195 Index 199 Contents ix...
Страница 12: ...x User s Guide...
Страница 16: ...xiv User s Guide...
Страница 18: ...xvi User s Guide...
Страница 26: ...6 User s Guide...
Страница 160: ...140 User s Guide...
Страница 164: ...144 User s Guide...
Страница 178: ...158 User s Guide...
Страница 182: ...162 User s Guide...
Страница 192: ...172 User s Guide...
Страница 211: ...responses expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix F Modem Configurations 191...
Страница 218: ...198 User s Guide...
Страница 222: ...202 User s Guide...
Страница 225: ......
Страница 227: ...Spine information IBM Intellistation POWER 9112 Model 265 User s Guide SA38 0608 00...