background image

v

Additional disk unit controllers are not allowed in SB2 and SB3 system units.

870 and 890 system unit

v

IOPs control IOAs in the direction of the arrows in the PCI bridge sets.

v

SCSI in the diagram indicates the first internal disk unit controller position
(cards 2757, 4778, 4748, 9748 or 9778). The first disk unit controller card must be
in C03 and connect the load source disk unit internal tape and CD-ROM or
DVD.

v

In addition, two disk unit controllers are allowed in 830 or 840 system units.

18

Upgrading the System Unit from Operations Console to Twinaxial Console (5540) V5R2

Содержание eServer iSeries 8 Series

Страница 1: ...iSeries 270 and 8xx Upgrading the System Unit from Operations Console to Twinaxial Console 5540 Version 5 ERserver...

Страница 2: ......

Страница 3: ...iSeries 270 and 8xx Upgrading the System Unit from Operations Console to Twinaxial Console 5540 Version 5 ERserver...

Страница 4: ...pyright International Business Machines Corporation 2000 2003 All rights reserved US Government Users Restricted Rights Use duplication or disclosure restricted by GSA ADP Schedule Contract with IBM C...

Страница 5: ...rent backup of your system including operating systems licensed programs and data __ 2 Ensure that you take a few minutes to become familiar with these instructions __ 3 If there are incorrect missing...

Страница 6: ...per foil at the end when you unroll the strap c Attach the copper foil to an exposed unpainted metal surface on the frame of the unit electrical ground Installing the 2746 workstation adapter card __...

Страница 7: ...lowing to help determine card placement Go to the Install PCI Card topic in the Information Center Contact your authorized service provider or your authorized dealer __ 6 Attention Adapter cards are f...

Страница 8: ...__ 10 Open the latch at the card position where you plan to install the card Move the latch counterclockwise and then swing the black latch out Figure 1 Example of 270 810 820 825 5075 Card Latch 4 Up...

Страница 9: ...tall the screw to secure the card __ 15 Go to Connecting the Twinaxial cable attachment and Twinaxial console cable Connecting the Twinaxial cable attachment and Twinaxial console cable __ 1 Find the...

Страница 10: ...le cable to the PC or workstation that is the system unit console Note The workstation address of your console must be set to 0 To set the address refer to the book that was shipped with your device _...

Страница 11: ...ement Decrement push button until 01 appears in the Function Data display __ j Press the Enter push button on the control panel 01 B M S should appear in the Function Data display If it does not repea...

Страница 12: ...ith System Devices display Press Enter __ 13 Select Twinaxial from the Select Console Type display Press Enter __ 14 Press F3 Exit once __ 15 Select Perform an IPL from the Use Dedicated Service Tools...

Страница 13: ...n you need to remove the back cover if you have one and the side cover __ 1 Place your hand near the bottom of the back cover and lift up and out __ 2 Attention If you are removing the side cover whil...

Страница 14: ...r view from back by loosening the thumbscrews and sliding the cover from front to back until it stops __ 3 Pull the cover out 830 840 870 890 SB2 SB3 5074 5079 and 5094 units To access the PCI card lo...

Страница 15: ...Accessing units in a rack 1 Move to the back of the rack press latch A and open the back door of the rack Removing the covers 11...

Страница 16: ...Press latches B and pull the server out using the handle C 3 Refer to previous unit diagrams to remove the side cover 12 Upgrading the System Unit from Operations Console to Twinaxial Console 5540 V5R...

Страница 17: ...4 If you are cabling the server feed the excess cabling along the cable management arm D and secure the cables with the fasteners Removing the covers 13...

Страница 18: ...14 Upgrading the System Unit from Operations Console to Twinaxial Console 5540 V5R2...

Страница 19: ...in the positions below the IOP For example an IOP in C04 would control IOAs in C03 and C02 v SCSI in the diagram indicates the first internal disk unit controller position cards 2757 2763 2782 4748 47...

Страница 20: ...first disk unit controller card must be in C05 and connect the load source disk unit internal tape and CD ROM or DVD device v Two internal disk unit controllers are allowed per 820 system unit v A se...

Страница 21: ...or DVD device v Three internal disk unit controllers are allowed per 825 system unit 830 840 SB2 and SB3 system unit v IOPs control IOAs in the direction of the arrows in the PCI bridge sets v SCSI i...

Страница 22: ...he diagram indicates the first internal disk unit controller position cards 2757 4778 4748 9748 or 9778 The first disk unit controller card must be in C03 and connect the load source disk unit interna...

Страница 23: ...v Additional disk unit controllers are not allowed in SB2 and SB3 system units Configuration tables 19...

Страница 24: ...20 Upgrading the System Unit from Operations Console to Twinaxial Console 5540 V5R2...

Страница 25: ...e unit v A constant light indicates that the unit is on and working B Power Push button C Processor Activity D System Attention E Function Data Display F Increment Decrement buttons G Enter Push butto...

Страница 26: ...Push button C Processor Activity D System Attention E Function Data Display F Increment Decrement buttons G Enter Push button H Mode Selects J Electronic Keystick Slot K Secure L Auto M Normal N Manua...

Страница 27: ......

Страница 28: ...Printed in U S A...

Отзывы: