Attaching the lift handles to the chassis
Attach the four lift handles to the chassis so that three people can lift the chassis onto the mounting
hardware.
To attach the lift handles to the chassis, complete the following steps:
1.
Depress the latches on each side of the handle (A) using your thumb and index finger.
2.
Align the holes in the lift handles with the six pins on the chassis, and then lift the handle up (B),
until the latches click into place.
3.
Repeat these steps for all four lift handles.
Installing the system into the rack
Use the procedure in this section to install the system into the rack. The procedure includes information
that is intended to promote safety and reliable operation.
CAUTION:
This system requires three people to install the system into the rack.
To install the system into the rack, complete the following steps:
1.
Extend the mounting hardware (1) as shown in Figure 11 on page 11.
Figure 10. Installing the lift handles
10
Power Systems: Installing the IBM Power System E850C (8408-44E)
Содержание E850C
Страница 1: ...Power Systems Installing the IBM Power System E850C 8408 44E GI11 9920 00 IBM...
Страница 2: ......
Страница 3: ...Power Systems Installing the IBM Power System E850C 8408 44E GI11 9920 00 IBM...
Страница 6: ...iv Power Systems Installing the IBM Power System E850C 8408 44E...
Страница 16: ...xiv Power Systems Installing the IBM Power System E850C 8408 44E...
Страница 54: ...38 Power Systems Installing the IBM Power System E850C 8408 44E...
Страница 67: ...Notices 51...
Страница 68: ...IBM Part Number 29R2425 Printed in USA GI11 9920 00 1P P N 29R2425...