v
You
do
not
have
to
disconnect
the
BladeCenter
T
unit
from
power
to
install
or
replace
any
of
the
hot-swap
modules
on
the
rear
of
the
BladeCenter
T
unit.
You
must
shut
down
the
operating
system
and
turn
off
a
hot-swap
blade
server
on
the
front
of
the
BladeCenter
T
unit
before
removing
the
blade
server,
but
you
do
not
need
to
shut
down
the
BladeCenter
T
unit
itself.
v
For
a
list
of
supported
options
for
your
BladeCenter
T
unit,
go
to
http://www.ibm.com/pc/compat/.
System
reliability
considerations
Attention:
To
help
ensure
proper
cooling
and
system
reliability,
make
sure
that:
v
Each
of
the
module
bays
on
the
front
and
rear
of
the
BladeCenter
T
unit
has
either
a
module
or
filler
module
installed.
v
Each
of
the
blade
bays
on
the
front
of
the
BladeCenter
T
unit
has
either
a
blade
server
or
filler
blade
installed.
v
Each
of
the
drive
bays
in
a
blade
server
storage
expansion
option
has
either
a
hot-swap
drive
or
a
filler
panel
installed.
v
A
removed
hot-swap
module
or
drive
is
replaced
within
1
minute
of
removal.
Failure
to
replace
a
module
or
drive
with
another
module,
drive,
or
filler
module
within
1
minute
can
affect
performance
in
the
blade
servers.
v
A
removed
blade
server
is
replaced
within
20
minutes
of
removal.
Failure
to
replace
a
blade
server
with
another
blade
server
or
filler
blade
within
20
minutes
can
affect
performance
in
the
blade
servers.
v
A
failed
blower
is
replaced
as
soon
as
possible,
to
restore
cooling
redundancy.
Handling
static-sensitive
devices
Attention:
Static
electricity
can
damage
electronic
devices
and
your
BladeCenter
T
unit.
To
avoid
damage,
keep
static-sensitive
devices
in
their
static-protective
packages
until
you
are
ready
to
install
them.
Use
an
ESD
wrist
strap
and
the
ESD
connectors
on
the
BladeCenter
T
unit.
Electrostatic
discharge
(ESD)
is
the
release
of
stored
static
electricity
that
can
damage
electric
circuits.
Static
electricity
is
often
stored
in
your
body
and
discharged
when
you
come
in
contact
with
an
object
with
a
different
potential.
The
ESD
wrist
strap
safely
channels
the
electricity
from
your
body
to
a
proper
ground
(the
BladeCenter
T
unit).
8
BladeCenter
T
Management
Module:
Installation
Guide
Содержание BladeCenter T Series
Страница 1: ...BladeCenter T Management Module Installation Guide...
Страница 2: ......
Страница 3: ...BladeCenter T Management Module Installation Guide...
Страница 20: ...6 BladeCenter T Management Module Installation Guide...
Страница 34: ...20 BladeCenter T Management Module Installation Guide...
Страница 42: ...28 BladeCenter T Management Module Installation Guide...
Страница 66: ...52 BladeCenter T Management Module Installation Guide...
Страница 73: ...Japanese Voluntary Control Council for Interference VCCI statement Appendix C Notices 59...
Страница 74: ...60 BladeCenter T Management Module Installation Guide...
Страница 78: ...64 BladeCenter T Management Module Installation Guide...
Страница 79: ......
Страница 80: ...Part Number 13N0323 Printed in USA 1P P N 13N0323...