
Table 20. C1001F00 to C1645300 checkpoints (continued)
v
If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v
See Chapter 3, “Parts listing, type 7891,” on page 225 to determine which components are CRUs and which
components are FRUs.
Progress code
Description
Action
C1009xA8
ASIC random data test in progress
1.
Go to “Checkout procedure” on page 176.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 264.
C1009xAC
ASIC enable machine check step in
progress
1.
Go to “Checkout procedure” on page 176.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 264.
C1009xB0
ASIC I/O initialization step in progress
1.
Go to “Checkout procedure” on page 176.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 264.
C1009xB4
ASIC DRAM initialization step in
progress
1.
Go to “Checkout procedure” on page 176.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 264.
C1009xB8
ASIC memory diagnostic step in
progress
1.
Go to “Checkout procedure” on page 176.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 264.
C1009xB9
PSI diagnostic step in progress
1.
Go to “Checkout procedure” on page 176.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 264.
C1009xBB
Restore L3 line delete step in progress
1.
Go to “Checkout procedure” on page 176.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 264.
C1009xBD
AVP memory test case in progress
1.
Go to “Checkout procedure” on page 176.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 264.
C1009xC0
Node interface alignment procedure in
progress
1.
Go to “Checkout procedure” on page 176.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 264.
C1009xC4
Dump initialization step in progress
1.
Go to “Checkout procedure” on page 176.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 264.
104
Power Systems: Problem Determination and Service Guide for the IBM PS703 (7891-73X) and PS704 (7891-74X)
Содержание BladeCenter PS703
Страница 2: ......
Страница 26: ...14 Power Systems Problem Determination and Service Guide for the IBM PS703 7891 73X and PS704 7891 74X...
Страница 240: ...228 Power Systems Problem Determination and Service Guide for the IBM PS703 7891 73X and PS704 7891 74X...
Страница 278: ...266 Power Systems Problem Determination and Service Guide for the IBM PS703 7891 73X and PS704 7891 74X...
Страница 286: ...274 Power Systems Problem Determination and Service Guide for the IBM PS703 7891 73X and PS704 7891 74X...
Страница 297: ......
Страница 298: ...Printed in USA GI11 9841 00...