Power off the system and place it in the service position. For instructions, see “Preparing the 9183-22X
system to remove and replace internal parts” on page 146.
Procedure
1. Attach the electrostatic discharge (ESD) wrist strap.
The ESD wrist strap must be connected to an unpainted metal surface until the service procedure is
completed, and if applicable, until the service access cover is replaced.
Attention:
• Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack,
or to an unpainted metal surface of your hardware to prevent the electrostatic discharge from
damaging your hardware.
• When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap is
used for static control. It does not increase or decrease your risk of receiving electric shock
when using or working on electrical equipment.
• If you do not have an ESD wrist strap, just prior to removing the product from ESD packaging
and installing or replacing hardware, touch an unpainted metal surface of the system for a
minimum of 5 seconds. If at any point in this service process you move away from the
system, it is important to again discharge yourself by touching an unpainted metal surface for
at least 5 seconds before you continue with the service process.
2. Lift the air baffle (A) straight up as shown in the following figure.
Place the air baffle on a clean area.
Figure 69. Removing the air baffle
3. Remove the drive cable holder on the left side of the system by using the following procedure.
a) Remove the drive cables from the drive cable holder.
b) Retract the retaining pin (A) as shown in the following figure.
Removing and replacing parts in the 9183-22X 79
Содержание 9183-22X
Страница 1: ...Power Systems Servicing the IBM Power System IC922 9183 22X IBM ...
Страница 14: ...xiv Power Systems Servicing the IBM Power System IC922 9183 22X ...
Страница 178: ...164 Power Systems Servicing the IBM Power System IC922 9183 22X ...
Страница 189: ......
Страница 190: ...IBM ...