![IBM 9114-275 - IntelliStation POWER 275 Скачать руководство пользователя страница 133](http://html.mh-extra.com/html/ibm/9114-275-intellistation-power-275/9114-275-intellistation-power-275_service-manual_606733133.webp)
Table
2.
Firmware
Checkpoints
(continued)
Checkpoint
Description
Action/
Possible
Failing
FRU
E139
Create
node
aliases
and
system
aliases
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E13A
Create
packages
node
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E140
Operating
system
load
See
“Boot
Problems/Concerns”
on
page
128..
E145
Early
debug
code
activated;
firmware
is
halted
Press
the
g
key
on
the
serial
interface.
E149
Create
boot
mgr
node
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E14C
Create
terminal-emulator
node
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E14D
Loading
boot
image
See
“Boot
Problems/Concerns”
on
page
128..
E150
Create
host
(primary)
PCI
controller
node
If
a
location
code
is
specified,
replace
the
adapter
at
that
location
code.
If
no
location
code
is
specified,
go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E151
Probing
primary
PCI
bus
If
a
location
code
is
specified,
replace
the
adapter
at
that
location
code.
If
no
location
code
is
specified,
go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E152
Probing
for
adapter
FCODE,
evaluate
if
present
Follow
the
repair
action
listed
for
checkpoint
E151.
E153
End
adapter
FCODE,
probe/evaluate
Follow
the
repair
action
listed
for
checkpoint
E151.
E154
Create
PCI
bridge
node
Follow
the
repair
action
listed
for
checkpoint
E151.
E155
Probing
PCI
bridge
secondary
bus
Follow
the
repair
action
listed
for
checkpoint
E151.
E156
Create
PCI
Ethernet
node
If
a
location
code
is
specified,
replace
the
adapter
at
that
location
code.
If
no
location
code
is
specified,
go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E15B
Transferring
control
to
operating
system
(service
mode
boot)
See
“Boot
Problems/Concerns”
on
page
128..
E15F
Adapter
VPD
probe
Follow
the
repair
action
listed
for
checkpoint
E151.
E170
Start
of
PCI
Bus
Probe
Follow
the
repair
action
listed
for
checkpoint
E151.
E172
First
pass
of
PCI
device
probe
Follow
the
repair
action
listed
for
checkpoint
E151.
Chapter
4.
Checkpoints
115
Содержание 9114-275 - IntelliStation POWER 275
Страница 1: ...IntelliStation POWER 9114 Model 275 Service Guide SA38 0636 00 ...
Страница 2: ......
Страница 3: ...IntelliStation POWER 9114 Model 275 Service Guide SA38 0636 00 ...
Страница 14: ...xii IntelliStation POWER 9114 Model 275 Service Guide ...
Страница 16: ...xiv IntelliStation POWER 9114 Model 275 Service Guide ...
Страница 50: ...32 IntelliStation POWER 9114 Model 275 Service Guide ...
Страница 58: ...40 IntelliStation POWER 9114 Model 275 Service Guide ...
Страница 81: ...Yes Go to Step 1321 16 on page 64 Chapter 3 Maintenance Analysis Procedures MAPs 63 ...
Страница 210: ...192 IntelliStation POWER 9114 Model 275 Service Guide ...
Страница 246: ...228 IntelliStation POWER 9114 Model 275 Service Guide ...
Страница 319: ...Chapter 10 Parts Information This chapter contains parts information for the IntelliStation POWER 9114 Model 275 301 ...
Страница 320: ...System Parts 302 IntelliStation POWER 9114 Model 275 Service Guide ...
Страница 330: ...312 IntelliStation POWER 9114 Model 275 Service Guide ...
Страница 332: ...314 IntelliStation POWER 9114 Model 275 Service Guide ...
Страница 336: ...318 IntelliStation POWER 9114 Model 275 Service Guide ...
Страница 340: ...322 IntelliStation POWER 9114 Model 275 Service Guide ...
Страница 375: ......
Страница 376: ... Printed in U S A July 2003 SA38 0636 00 ...
Страница 377: ...Spine information IntelliStation POWER 9114 Model 275 IntelliStation POWER 9114 Model 275 Service Guide SA38 0636 00 ...