Note:
The
user
might
already
have
a
2145
uninterruptible
power
supply
(2145
UPS)
installed
in
the
rack
that
has
available
spare
capacity.
Therefore,
the
SAN
Volume
Controller
can
be
delivered
without
a
UPS.
3.
If
you
are
installing
the
master
console,
be
sure
to
read
all
of
the
safety
checks
that
are
detailed
in
the
IBM
System
Storage
Master
Console
for
SAN
File
System
and
SAN
Volume
Controller:
Installation
and
User’s
Guide
.
Refer
to
the
IBM
System
Storage
SAN
Volume
Controller:
Planning
Guide
,
which
provides
the
hardware
location
chart,
the
cable
connection
table,
and
the
configuration
data
table
for
the
user
to
complete
prior
to
installation.
Related
reference
Ensure
that
your
physical
site
meets
the
installation
requirements
for
the
uninterruptible
power
supply
(UPS).
Before
installing
the
SAN
Volume
Controller,
you
must
prepare
the
physical
environment.
Installing
the
support
rails
for
the
2145
UPS-1U
You
must
install
the
support
rails
in
the
rack
before
installing
the
2145
uninterruptible
power
supply-1U
(2145
UPS-1U).
Complete
the
following
prerequisites
before
installing
the
support
rails:
1.
Refer
to
the
user’s
hardware
location
table
to
determine
where
in
the
rack
the
2145
UPS-1U
is
to
be
installed.
2.
Discard
the
two
handles
and
their
associated
nuts
that
are
shipped
with
the
support
rails.
3.
At
the
back
of
the
rack,
observe
the
Electrical
Industries
Association
(EIA)
positions,
and
determine
where
you
are
going
to
install
the
2145
UPS-1U.
The
2145
UPS-1U
must
always
be
installed
into
the
lowest
available
position
in
the
rack.
The
only
device
that
can
be
beneath
a
UPS
is
another
UPS.
Perform
the
following
steps
to
install
the
support
rails
for
the
2145
UPS-1U:
1.
Place
the
2145
UPS-1U
on
a
flat
surface
with
the
front
facing
you.
2.
Attach
the
long
side
of
a
mounting
bracket
1
to
each
side
of
the
2145
UPS-1U
using
four
M3
×
6
screws
2
for
each
bracket.
See
3.
Loosen
the
assembly
wing
nuts
(see
1
in
on
both
rail
assemblies
and
adjust
the
rail
size
to
the
depth
of
your
rack.
1
2
svc00004
Figure
25.
Installing
the
support
rails
for
a
2145
UPS-1U
into
the
rack
50
IBM
System
Storage
SAN
Volume
Controller:
Installation
Guide
Содержание 2145-4F2
Страница 1: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Страница 2: ......
Страница 3: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Страница 8: ...vi IBM System Storage SAN Volume Controller Installation Guide...
Страница 74: ...44 IBM System Storage SAN Volume Controller Installation Guide...
Страница 78: ...48 IBM System Storage SAN Volume Controller Installation Guide...
Страница 120: ...90 IBM System Storage SAN Volume Controller Installation Guide...
Страница 122: ...92 IBM System Storage SAN Volume Controller Installation Guide...
Страница 128: ...98 IBM System Storage SAN Volume Controller Installation Guide...
Страница 134: ...104 IBM System Storage SAN Volume Controller Installation Guide...
Страница 138: ...108 IBM System Storage SAN Volume Controller Installation Guide...
Страница 141: ......
Страница 142: ...Part Number 31P0797 Printed in USA GC26 7900 00 1P P N 31P0797...
Страница 143: ...Spine information IBM System Storage SAN Volume Controller Installation Guide Version 4 1 0...