1-13
INSTALLATION
SFC COMBI BOILERS SFC-99, SFC-125
For side venting of multiple unit sets, group all intake terminals together with 6"
(minimum) lateral spacing, and similarly group the exhaust pipes. Place the 2
groups on the same plane of the building (e.g., north facing wall). Place the 2
groups of pipes at least 3' apart (the closest intake and exhaust pipes must be
36" - or more – apart). Use same 12" (minimum) vertical separation (see A in
Figure 12). Alternatively, as long as the units are identical models - intake and
exhaust terminals can maintain a minimum of 12" of separation horizontally from
any exhaust or inlet termination of an adjacent unit (see B in Figure 12). For
alternative group terminations, contact the IBC Factory for written guidance.
Concentric Side Wall Termination Kits
Installation of multiple Concentric Side Wall Termination kits:
•
On the same horizontal line (not stacked)
•
With a minimum vertical separation of 12” center to center
Use caution when installing Concentric Side Wall Termination kits when the outdoor
design temperature is below 5°F / -15°C. Possible blockage of the combustion air
intake increases when the outdoor temperature drops below this temperature.
Approved Concentric Side Wall Termination Kits are listed below: (Alternative
vent termination kits must be submitted to IBC for approval prior to installation.)
•
Centrotherm – Innoflue #ICWT242 (2” termination) + ICTC0224 (2” transition
to 2 pipe)
•
Centrotherm – Innoflue #ICWT352 (3” termination) + ICTC0335 (3” transition
to 2 pipe)
•
Duravent – Polypro #3PPS-HK – Horizontal Termination Kit – Concentric
•
Ipex #197006 – 3" PVC Concentric Termination kit
•
Ipex #197009 – 3" CPVC Concentric Termination kit
Figure 14: Prohibited installation
Figure 12: Sidewall vent termination - multiple vent piping configuration
Figure 13: IBC recommended
minimum vent terminal clearance
under ventilated soffit
Содержание SFC-99
Страница 54: ...INSTALLATION AND OPERATION INSTRUCTIONS 2 8 SFC COMBI BOILERS SFC 99 SFC 125 PAGE INTENTIONALLY LEFT EMPTY...
Страница 75: ...6 1 DIAGRAMS SFC COMBI BOILERS SFC 99 SFC 125 6 0 DIAGRAMS 6 1 PARTS DIAGRAMS 6 2 WIRING DIAGRAMS...
Страница 81: ...SERVICE RECORD DATE LICENSED CONTRACTOR DESCRIPTION OF WORK DONE...