61
6.0 Boiler operation
Before operating the appliance, there are some important pre-igntion checks that need to be
performed. For more information, see
Before operating the boiler on page 59
. To understand the boiler
start-up process, see
Sequence of Operation on page 99
. If the sight glass viewport clouds up at start-
up, see
Cleaning the sight glass on page 81
.
6.1 Lighting and shutting down the boiler
Start-up Checklist
Check
Followed lighting and shutting down procedure.
□
Tested the ignition safety shutoff function (see
Testing the ignition safety shutoff on page
).
□
Checked the appliance's fuel source, and if necessary,
using
the appropriate P-kit.
□
Содержание IBGFSW1-0110
Страница 8: ...Intentionally left empty ...
Страница 14: ...Intentionally left empty ...
Страница 52: ...Figure 36 Two pump two load parallel piping concept 48 Section Installation ...
Страница 74: ...Intentionally left empty ...
Страница 100: ...Intentionally left empty ...
Страница 101: ...97 Appendices Wiring diagrams Figure 48 Controller electrical diagram ...
Страница 102: ...Figure 49 Internal wiring diagram 98 Section Appendices ...
Страница 103: ...Figure 50 Sequence of Operation 99 Appendices ...
Страница 106: ...102 Section Appendices ...