AST0922-940
Page
9
Table of Contents
Page
Introduction ……………………………………………………………… 10
Superior Design
Superior Operation
Installation ………………………………………………………………...10
Location Selection
Water Line Connection
Drain Line Connection
Brine Line Connection
Brine Tank Overflow Line Connection
Electrical Connection
Placing Conditioner into Operation …………………………………. 13
Adjustment of Timer ……………………………………………………. 14
Special Features of Timer
Adjustment of Brine Control ………………………………………….. 14
How to Set the Salt Dial
Service ……………………………………………………………………. 15
Removing the Timer Assembly
Removing the Valve Assembly
Preventative Maintenance ………………………………………….…. 17
Injector Screen and Injector
Specifications …………………………………………………………… 18
Pressure Graphs ………………………………………………………... 19
Control Valving identification…………………………………………. 20
Valve Disc Operation …………………………………………………... 20
Flow Diagrams ……………………………………………………….….. 21
Replacement Parts ……………………………………………………... 22
Trouble Shooting ……………………………………………………….. 26
Disinfection of Water Conditioners………………………………….. 27
Содержание AST0922-940
Страница 20: ...AST0922 940 Page 20 Control Valving Identification Valve Disc Operation...
Страница 21: ...AST0922 940 Page 21 Flow Diagrams...
Страница 22: ...AST0922 940 Page 22...
Страница 24: ...AST0922 940 Page 24...
Страница 25: ...AST0922 940 Page 25 Valve Body and Tank Adaptor Module...
Страница 29: ...AST0922 940 Page 29...