![background image](http://html1.mh-extra.com/html/ibc-solar/aerofix-15-s/aerofix-15-s_installation-instructions-manual_3224930053.webp)
53
Version 18.01, 1-Mar-2018
11.3 IBC Aerofix Stiction Log
IBC AeroFix flat-roof system
Test record
Determination of stiction coefficients
CUSTOMER INFORMATION
Name
Phone
Company
Mobile
Street / No.
Fax
Post
code/city
CONSTRUCTION PROJECT
Customer
name
Phone
Street / No.
Mobile
Post
code/city
Fax
Com.:
TEST PROCEDURE
The test specimen (10 kg on IBC stiction gauge)
is placed onto the roof membrane with the
appropriate protective matting. After the defined
waiting period (around 30 seconds) has elapsed,
parallel force is applied centrally to the test
specimen using the tension spring, and then
measured using the spring scale. It is important
that the force be applied evenly. The maximum
force that can be applied before the test
specimen begins to move indicates the
coefficient of friction.
The tests are to be performed in accordance with the October 2004 edition of DIN EN ISO 8295, Plastics -
Films and sheeting - Determining coefficients of friction.
A total of 10 tests are to be carried out: five dry, five wet. The tests are to be distributed evenly across the roof
surface.
Visually dissimilar roof areas are to be tested separately from one another. The tests are to be repeated
accordingly.
Before testing begins, the roof membrane areas where measurements are being taken should be cleaned.
Static friction coefficient µ = F /G
Содержание AeroFix 15-S
Страница 1: ...1 Installation instructions IBC AeroFix Version 18 01 Date 1 Mar 2018...
Страница 15: ...15 Version 18 01 1 Mar 2018 Fig 12 Installation base rails Fig 13 Installation base rails...
Страница 39: ...39 Version 18 01 1 Mar 2018 Fig 56 Wind plate assembly starting from the left Fig 57 Insert wind plate...
Страница 40: ...40 Version 18 01 1 Mar 2018 Fig 58 Wind plate assembly Fig 59 Fixation wind plate...
Страница 41: ...41 Version 18 01 1 Mar 2018 7 8Cable clip assembly Fig 61 assembly cable clip 90 Fig 60 assembly cable clip 0...
Страница 52: ...52 Version 18 01 1 Mar 2018...
Страница 55: ...55 Version 18 01 1 Mar 2018 11 4 Checklist IBC AeroFix...
Страница 56: ...56 Version 18 01 1 Mar 2018...
Страница 57: ...57 Version 18 01 1 Mar 2018 12 Notes...