Приобретите продукт IBA ibaRackline-PC CAM и загрузите его руководство пользователя бесплатно с нашего веб-сайта. Получите подробную информацию о настройке и использовании вашей новой камеры. Посетите manualshive.com для скачивания.
ibaRackline-PC CAM/HD
Manual
Issue 1.1
27
7.
Remove the mounting angles on the left and right side from the power supply unit
by loosening 2 screws from the inner side.
8.
In order to install a new power supply unit, proceed in reversed order.
Страница 1: ...ibaRackline PC CAM HD iba Industrial Computer Manual Issue 1 1...
Страница 2: ...d trademark of the Microsoft Corporation Other product and company names mentioned in this manual can be labels or registered trademarks of the corresponding owners Certification The device is certifi...
Страница 3: ...switching on 16 7 Installation of measuring or additional boards 17 7 1 Safety instructions and notes 17 7 2 Basic procedure 17 7 3 Opening the device 18 7 4 Installing ibaOut Temp ibaOut State 19 8...
Страница 4: ...key 36 9 2 4 Partitioning 37 9 2 5 Completing installation 39 9 3 Windows Updates 39 9 4 Antivirus Software 39 9 5 Installing iba software 39 10 Technical data 40 10 1 Main data 40 10 2 Electronic com...
Страница 5: ...he she is capable of assessing safety and recognizing possible consequences and risks on the basis of his her specialist train ing knowledge and experience and knowledge of the standard regulations 1...
Страница 6: ...and the system or machine to be controlled there is a risk of death or severe injury The non observance of this safety information may result in a potential risk of death or severe injury The non obs...
Страница 7: ...nal DVD drive The documentation contains Manual pdf Third party documentation pdf Windows 10 Enterprise Long Term Servicing Version or Windows Server Version Recovery medium for the respective Windows...
Страница 8: ...er supply unit 1 RAID controller external DVD drive Upgrade options Server system with Windows Server 2016 or higher Hard disc extension from 5x 4 TB to 5x 8 TB SAS or to 5x 12 TB SAS Additional graph...
Страница 9: ...l minutes until the components have cooled down This will prevent injuries due to the electric shock or burns Connect the device to one supply voltage only according to specifications on the built in...
Страница 10: ...disk indicators 5 Reset button 6 Power button 7 Plug in slots for hard disks Note On delivery of the device the iba software license key is in the documentation or on client s request plugged in in t...
Страница 11: ...r view 1 2x Power supply with switch and plug for non heating appliances replaceable 2 Slots X20 to X26 iba cards for rackline slot 3 Connections for external devices keyboard mouse network etc 4 Slot...
Страница 12: ...ernal view 1 PCI Express slots 2 Controller 3 Slots for iba cards for rackline slot 4 Power supply unit for RAID systems redundant 5 Drive frame 6 Fan 12 cm mounting angle for redundant power supply u...
Страница 13: ...reen red Power supply OK Power supply error Redundant power supply error in one of the two power supply units 5 4 1 ibaOut Temp ibaOut Temp provides two relay outputs for temperature and power supply...
Страница 14: ...the switch positions Switch state switch state Power OK temperature OK Power off or Power error and overtemperature Power error temperature OK Power OK overtemperature Contact loading capacity Nominal...
Страница 15: ...the first card card no 0 Installation slots for cards with rackline slots X20 X26 ibaOut Temp or ibaOut State is installed in slot X20 ibaFOB 4o D rackline slot is installed starting with X25 and con...
Страница 16: ...Note If you install the device into a 19 cabinet with rotating rack consider the depth of the device Observe the minimum bending radii of the cables 1 Place the device from the front onto the 19 rack...
Страница 17: ...burns Pay attention to sharp edges in the housing Electrostatic discharge Touch the components only in electrostatically discharged state Note If you upgrade the device observe the instructions in the...
Страница 18: ...Manual ibaRackline PC CAM HD 18 Issue 1 1 7 3 Opening the device 1 Turn the screws located on the upper side of the cover a quarter of a turn counter clockwise 2 Lift the housing cover...
Страница 19: ...ion is described below using the example of ibaOut Temp in an ibaRackline system ibaOut Temp Order no 11 110001 ibaOut State Order no 11 110002 After having opened the housing cover proceed as follows...
Страница 20: ...ents only in electrostatically discharged state Hold the card cautiously at the edges and at the slot bracket 4 Insert the card in the respective slot The bar at the bottom is used to fix the card 5 F...
Страница 21: ...connec tion is not necessary when a standard power supply unit is used 2 Power supply connection Use the cable included in delivery Connect the con nector of the power supply cable from the power supp...
Страница 22: ...Manual ibaRackline PC CAM HD 22 Issue 1 1 7 Properly installed card 8 Fix the cable with a cable tie and close the housing cover...
Страница 23: ...ng cover 6 Carry out the maintenance work 7 Attach the housing cover again 8 Put the device into operation again 8 2 Cleaning or replacing the dust filter Depending on the installation site it is nece...
Страница 24: ...ean the fan or insert a new one 5 Connect the cables of the fan and the cables of the computer with the cable con nector 6 Insert the fan again 7 Fasten the fan with the 4 srews at the housing 8 4 Rep...
Страница 25: ...tening screw 1 Loosen the fastening screw which is used to secure the power supply slide in module at the frame 2 Pull out the power supply slide in module Replace the power supply slide in module wit...
Страница 26: ...er supply unit inside the housing 4 Loosen 2 screws each on the left and the right side which are used to fix the bar 1 and remove the bar 5 Disconnect all cable connections to the mainboard and the d...
Страница 27: ...HD Manual Issue 1 1 27 7 Remove the mounting angles on the left and right side from the power supply unit by loosening 2 screws from the inner side 8 In order to install a new power supply unit procee...
Страница 28: ...rd RAID Open the Intel Rapid Storage Technology enterprise console by double clicking the icon in the task bar Now select the corresponding RAID array with the status Degraded 1 and click on Rebuild t...
Страница 29: ...ne PC CAM HD Manual Issue 1 1 29 Click on Rebuild to start the process The duration of the process varies depending on the hard disk capacity Note System performance may be affected during the rebuild...
Страница 30: ...Drivers and Manu als maxView Storage Manager is a web application which requires a web browser e g Internet Explorer Note The program maxView Storage Manager may be configured that the administrator w...
Страница 31: ...able Device 1 in the example above and click on the Locate icon in the Physical device section The available hard disk blinks in the drive frame 5 Replace the defective hard disk Note The removal and...
Страница 32: ...But the hard disk has not been registered in the system 7 Mark the new hard disk Device 2 in the example above and click on the Initialize icon in the Physical Device section 8 Then click on the Spar...
Страница 33: ...ibaRackline PC CAM HD Manual Issue 1 1 33 10 Confirm the following overview with Finish 11 The following message appears when the operation was successful Otherwise an error message appears...
Страница 34: ...al ibaRackline PC CAM HD 34 Issue 1 1 12 The progress of the rebuild process is displayed under Tasks 13 As soon as the hard disk has been successfully registered in the system the pro gram can be clo...
Страница 35: ...ers will be installed Do not change the basic configuration of the device components e g motherboard If you modify the device components it may happen that the installation with the Re covery medium i...
Страница 36: ...he process 9 2 2 Select the language When the installation has started you can select the sytem language to be installed When using Windows 10 Enterprise x64 and Windows Server 2016 the language can b...
Страница 37: ...ve already used Windows 10 Enterprise or Win dows Server Substitute the operating system on a drive already used substitute Windows 10 Enterprise with Windows Server or vice versa Possibility 1 New dr...
Страница 38: ...continue with chapter 9 2 5 Completing installation Possibility 3 Restore or replace the operating system The drive is already in use and you want to install the operating system 1 Mark the system pa...
Страница 39: ...ms as iba does not know which Windows update policies apply in your company Please adjust the settings according to the update policies in your company Consult your IT department if necessary 9 4 Anti...
Страница 40: ...4 A 47 Hz to 63 Hz Power output Max 500 W Mechanical data Dimensions Height x Width x Depth 7 09 in 4 HU x 19 02 in x 21 42 in 178 mm 4 HU x 483 mm x 544 mm installation depth 19 69 in 500 mm Weight i...
Страница 41: ...PC CAM XEON E Win 10 40 005021 ibaRackline PC HD XEON E Win10 40 005031 Enhancement options Upgrade to Server Operating System 43 000380 Upgrade ibaRackline PC HD CAM with Graphic Card 43 001001 Upgra...
Страница 42: ...Manual ibaRackline PC CAM HD 42 Issue 1 1 10 4 Device dimensions Dimensions given in mm...
Страница 43: ...the product Contact Headquarters iba AG Koenigswarterstrasse 44 D 90762 Fuerth Germany Phone 49 911 97282 0 Fax 49 911 97282 33 E mail iba iba ag com Mailing address iba AG Postbox 1828 D 90708 Fuerth...