
110
9.7 Ladder
Sequence Flowchart
Operation flowchart for the second axis (axis 0) and third axis (axis 1) which are DeviceNet slave axes is as
follows. Insides of parentheses are SIO link axis Nos.
Gateway unit
normal
SIO link axis designation
SIO link start
Axes (0)(1) PWR
check
Turn on servo for axes (0)(1)
Command P.No.=0 to axes (0)(1)
Set CSTR to “1”
Set CSTR to “0”
One second timer
Positioning completed
[2]
[1]
Содержание CC-Link
Страница 1: ...IAI America Inc CC Link RCM GW CC Gateway Unit Operation ManualFirst Edition ...
Страница 4: ......
Страница 10: ...6 1 5 How to identify model RCM GW CC Basic model For CC Link Gateway unit ...
Страница 12: ...8 2 2 External dimension drawing Mounting dimension ...
Страница 78: ...74 ...
Страница 82: ...78 Position data measurement value Present position 1 2 3 4 4 5 6 7 ...
Страница 84: ...80 Speed acceleration and deceleration set value Actuator speed Speed n2 Speed n3 1 2 3 ...
Страница 88: ...84 Command position No Completion position No 1 2 3 4 5 6 ...
Страница 91: ...87 ...
Страница 93: ...89 ...
Страница 115: ...111 Command P No 1 to axes 0 1 Set CSTR to 1 Set CSTR to 0 Positioning completed One second timer 2 1 ...
Страница 125: ...121 No 3 Axis 1 pause No 3 Axis 1 pause lamp No 3 Axis 1 STP ...
Страница 130: ...126 ...
Страница 131: ......