14
2
Rack mounting
Step 3
Install the recorder in the rack by using four rack
mounting screws.
Secure with rack mounting screws (4 pcs.).
• Screw tightening torque:
2.0 N·m to 2.4 N·m (20.5 k
g
f·cm to 24.5 k
g
f·cm)
{1.48 lbf·ft ~
1.78lbf·ft}
Rack mounting screws (M5 × 12, locally procured)
Important:
• The operating temperature range of this product is
0 °C ~ +45 °C.
* HDDs deteriorate at high temperatures, affecting their
service life. It is recommended that the product be
used at a temperature of about +25 °C.
• The following measures should be taken when installing
the rack to ensure that the product is used within the
operating temperature range.
嵣
Install a fan or other equipment to lower the
temperature inside the rack.
嵣
Allow a distance of at least 1U (44 mm) between the
top and bottom of the product.
嵣
Do not put doors on the front of the rack or block
the sides.
Use a rack equivalent to the EIA standard for mounting this
product.
* EIA standard equivalent (manufactured by other
companies): EIA 19-inch, depth of 550 mm or more
Note:
• Use four M5 × 12 screws (locally procured) to install the
recorder in a rack.
• The illustration on this page is schematic. Details of the
shape are omitted.
Installation procedure
Step 1
Remove the five rubber feet from the bottom of the
recorder.
Remove the rubber feet
Step 2
Attach the rack mount brackets (WV-QRM201: option)
on both sides of the recorder.
Secure with the rack mount bracket fixing screws (4 pcs.)
(included with WV-QRM201).
• Screw tightening torque:
0.59 N·m ~ 0.78 N·m (6.0 k
g
f·cm ~ 8.0 k
g
f·cm)
{0.43 lbf·ft ~ 0.58 lbf·ft}
Rack mount bracket fixing screws (M3×10 included with the bracket)
Rack mount brackets (option)
Note:
• The rack mount bracket has two types of screw holes;
use the smaller holes.