10. Handling of Product
10-1.Conductivity test
10-1-1. Male connector
①
When carrying out conductivity test of the male connector, place the probe on the end of the male terminal (Load:0.5N MAX.)
If load 0.5N and more, male terminal(s) may be damaged. (see Figs. 41)
②
If there is any damage or deformation, do not use the damaged item.
Replace the item with a new one.
10-2.Arrangement of Wires
①
When arranging the wires horizontally, to avoid excessive stress to the sidewalls and terminals,
and the terminal leaning in the core hole, please keep the wires straight (at least 15mm) from connector as shown in Fig.42.
②
Once straight portion is secured, arrange the wires with arbitrary R.
Fig 41.Conductivity test for male terminals (contacts)
Fig 42. Arrangement of harnesses
15
㎜
MIN.
Place the probe on the tip of the male terminal
Straight portion