background image

 

User manual 

 

very

 

important.

 

Noise

 

reduction

 

engineering

 

is

 

a

 

comprehensive

 

and

 

professional

 

engineering.

 

During

 

the

 

process

 

when

 

users

 

try

 

to

 

design

 

the

 

scheme

 

for

 

noise

 

reduction

 

project,

 

at

 

the

 

same

 

time

 

please

 

fully

 

consider

 

the

 

bottom

 

limit

 

of

 

air

 

inlet/outlet

 

volume

 

needed

 

by

 

engine’s

 

normal

 

running

 

and

 

the

 

maximum

 

allowed

 

value

 

for

 

exhaust

 

backpressure

 

etc.

 

Otherwise,

 

the

 

noise

 

reduction

 

project

 

will

 

seriously

 

affect

 

generator

 

set’s

 

output

 

power,

 

and

 

make

 

generator

 

set’

 

s

 

temperature

 

rise,

 

cause

 

frequent

 

malfunction

 

of

 

the

 

generator

 

set,

 

and

 

even

 

it

 

will

 

shorten

 

the

 

life

 

expectancy

 

of

 

generator

 

set.

 

 

Note:

 

HYUNDAI

 

Power

 

can

 

provide

 

customers

 

with

 

overall

 

sound

 

proof

 

generator

 

set.

 

 

2.6

 

Cooling

 

system

 

Our

 

standard

 

configuration

 

diesel

 

generator

 

sets

 

are

 

closed

 

cycling

 

water

 

chilling

 

units

 

with

 

fan

 

and

 

radiator

 

installed.

 

Closed

 

water

 

chilling

 

engine

 

drive

 

the

 

cooling

 

pump

 

to

 

generate

 

circulation

 

power,

 

which

 

keep

 

the

 

anti

freeze

 

in

 

the

 

paths

 

of

 

cylinder

 

body

 

and

 

cover

 

continuous

 

circulation

 

and

 

heat

 

elimination.

 

Engine’s

 

cooling

 

pump,

 

radiator

 

(or

 

heat

 

exchanger)

 

forms

 

a

 

closed,

 

pressure

 

cycling

 

and

 

cooling

 

system.

 

The

 

most

 

common

 

cooling

 

system

 

is

 

cooling

 

fan

 

directly

 

driven

 

by

 

radiator

 

and

 

engine,

 

which

 

can

 

be

 

replaced

 

by

 

heat

 

exchanger,

 

remote

 

radiator

 

or

 

remote

 

cooling

 

tower

 

etc.

 

If

 

the

 

installation

 

position

 

of

 

the

 

remote

 

cooling

 

fan

 

is

 

relatively

 

higher,

 

transmission

 

radiator

 

is

 

needed

 

to

 

prevent

 

the

 

damage

 

of

 

heat

 

exchanger

 

caused

 

by

 

too

 

big

 

internal

 

pressure.

 

 

Note:

 

The

 

dirty

 

material

 

stay

 

in

 

the

 

radiator’s

 

core

 

will

 

greatly

 

affect

 

radiator’s

 

cooling

 

capacity.

 

And

 

therefore

 

it

 

is

 

necessary

 

to

 

clean

 

the

 

radiator

 

often.

 

 

2.6.1

 

Coolant

 

Cooling

 

system

 

shall

 

use

 

the

 

coolant

 

which

 

can

 

protect

 

the

 

engine

 

from

 

contamination

 

and

 

freezing.

 

Coolant

 

shall

 

be

 

a

 

mixture

 

of

 

pure

 

water

 

and

 

anti

freeze

 

or

 

pure

 

water

 

and

 

anti

rust

 

fluid.

 

In

 

this

 

mixture,

 

water

 

PH

 

value

 

shall

 

be

 

between

 

6

8,

 

usually

 

suggest

 

to

 

use

 

distilled

 

water.

   

The

 

specific

 

mixing

 

ratio

 

shall

 

be

 

according

 

to

 

local

 

weather,

 

and

 

that

 

of

 

the

 

coolant

 

recommended

 

by

 

the

 

engine

 

supplier,

 

and

 

reference

 

to

 

the

 

operation

 

(preparation)

 

manual

 

of

 

the

 

coolant.

 

Mix

 

the

 

liquids

 

in

 

a

 

separate

 

container

 

evenly

 

and

 

then

 

add

 

the

 

mixture

 

into

 

the

 

radiator,

 

ensure

 

the

 

anti

freeze

 

will

 

not

 

freeze

 

under

 

low

 

temperature.

 

In

 

the

 

area

 

when

 

there

 

is

 

low

 

possibility

 

of

 

freezing,

 

the

 

coolant

 

can

 

be

 

a

 

mixture

 

of

 

water

 

and

 

anti

rust,

 

according

 

to

 

the

 

anti

rust

 

which

 

recommended

 

by

 

the

 

engine

 

supplier

 

and

 

refer

 

to

 

its

 

operation

 

manual,

 

mix

 

the

 

liquids

 

in

 

a

 

separate

 

container

 

evenly

 

and

 

then

 

add

 

the

 

mixture

 

into

 

the

 

radiator.

 

At

 

the

 

first

 

time

 

when

 

anti

rust

 

is

 

added,

 

the

 

generator

 

set

 

shall

 

be

 

kept

 

running

 

until

 

it

 

get

 

to

 

hot

 

so

 

that

 

to

 

achieve

 

the

 

best

 

effect

 

of

 

anti

corrosion.

 

 

Engine’s

 

coolant

 

shall

 

have

 

three

 

functions

 

listed

 

as

 

below:

 

Provide

 

enough

 

heat

 

transmission

 

capacity

 

Prevent

 

all

 

metal

 

material

 

and

 

sealing

 

material

 

within

 

the

 

cooling

 

system

 

from

 

corrosion(Cave

 

corrosion)

 

Provide

 

sufficient

 

anti

freeze

 

capacity

 

 

Warning:

 

!

 

To

 

choose

 

the

 

anti

freeze

 

which

 

is

 

recommended

 

and

 

approved

 

by

 

the

 

qualified

 

engine

 

supplier

 

is

 

the

 

critical

 

point

 

to

 

ensure

 

engine’s

 

normal

 

running.

 

!

 

Do

 

not

 

mix

 

the

 

anti

freeze

 

and

 

anti

rust

 

of

 

any

 

types,

 

this

 

will

 

generate

 

a

 

large

 

amount

 

of

 

bubble

 

and

 

reduce

 

the

 

coolant’s

 

performance.

   

     

!

 

If

 

the

 

anti

freeze

 

used

 

in

 

the

 

generator

 

set

 

is

 

of

 

bad

 

quality

 

and

 

not

 

approved

 

by

 

the

 

engine

 

supplier,

 

which

 

cause

 

the

 

malfunction

 

of

 

the

 

generator

 

set

 

(water

 

leakage,

 

contamination

 

and

 

etc.),

 

this

 

malfunction(s)

 

does

 

not

 

belong

 

to

 

the

 

scope

 

of

 

warranty.

 

 

2.6.2

 

Change

 

of

 

coolant

 

The

 

effect

 

of

 

anti

freeze

 

and

 

anti

rust

 

will

 

decrease

 

by

 

the

 

time

 

period

 

of

 

service.

 

And

 

therefore

 

periodically

 

change

 

of

 

anti

freeze

 

is

 

a

 

must.

 

The

 

mixture

 

of

 

anti

freeze

 

shall

 

be

 

changed

 

in

 

every

 

two

 

years.

 

The

 

mixture

 

of

 

anti

rust

 

shall

 

be

 

changed

 

at

 

least

 

one

 

time

 

every

 

year.

 

And

 

if

 

filter

 

of

 

the

 

coolant

 

is

 

installed,

 

at

 

least

 

this

 

filter

 

shall

 

be

 

changed

 

in

 

every

 

half

 

of

 

year

 

(please

 

refer

 

to

 

the

 

engine

 

operation

 

manual

 

for

 

the

 

specific

 

intervals

 

of

 

the

 

changes

 

required).

 

When

 

it

 

is

 

time

 

to

 

discharge

 

the

 

coolant,

 

make

 

sure

 

the

 

generator

 

set

 

has

 

been

 

shut

 

down

 

and

 

the

 

engine

 

has

 

been

 

fully

 

cooled

 

down,

 

then

 

open

 

the

 

radiator’s

 

liquid

 

adding

 

hole.

 

After

 

that

 

open

 

the

 

discharge

 

valve

 

installed

 

in

 

the

 

radiator

 

and

 

in

 

the

 

engine

 

respectively

 

to

 

discharge

 

the

 

water.

 

If

 

the

 

generator

 

set

 

is

 

furnished

 

with

 

coolant

 

filter,

 

it

 

shall

 

be

 

detached

 

from

 

the

 

engine

 

and

 

be

 

changed.

 

 

2.6.3

 

Cleaning

 

of

 

cooling

 

system

 

Содержание DHY11KSE

Страница 1: ...Diesel Generator User Manual...

Страница 2: ......

Страница 3: ...s close to the battery and fuel because the mixture of volatilization from fuel and hydrogen generated by battery charging process will cause explosion when it meets sparkle or naked flame The generat...

Страница 4: ...is running do not attempt to reach under or around the guards to do maintenance or for any other reason Keep hands arms long hair loose clothing and jewelers away from pulleys belts and other moving...

Страница 5: ...al disconnected prior to attempting to connect or disconnect load connections Do not attempt to connect or disconnect load connections while standing in water or on wet or soggy ground Make sure conne...

Страница 6: ...rator Set Working Room 4 2 5 Installation of Generator Set 5 2 6 Cooling system 7 2 7 Lubricant system 8 2 8 Fuel system 8 2 9 Battery 10 2 10 Electrical Connection 11 2 11 Power distribution system 1...

Страница 7: ...andby power supply to provide continue electric power for non invariable loads The generator set is suitable for the area where must ensure continue power supply such as hospitals industrial facilitie...

Страница 8: ...pusher fan and thermostat The alternator has its own internal fan to cool the alternator components 1 6 Electrical System The engine electrical system is 12 volt or 24 volts DC negative ground earth...

Страница 9: ...litated onnect direc valve is an UNDAI Pow n for the rplus lubrica t by openin ransportatio been designe Standard ca fting hole o enerator set canopy roo me which b o have stati the generato Optional...

Страница 10: ...ect to other architecture s foundation The width and depth of foundation shall meet requirement Ensure foundation s levelness and smoothness If possible waste discharge sink can be sued so that the wa...

Страница 11: ...et to outside For example corrugated vibration reduction pipe has been used to connect exhaust pipes air exhaust path fuel inlet pipe fuel return pipe and busbar cable etc all of these parts need to u...

Страница 12: ...ssure and side stress Reserve some space for hot shrinkage and cold expansion Reserve space for generator set vibration Reduce exhaust noise level Overload of exhaust backpressure will cause following...

Страница 13: ...the liquids in a separate container evenly and then add the mixture into the radiator ensure the anti freeze will not freeze under low temperature In the area when there is low possibility of freezing...

Страница 14: ...specification as that existing in the radiator For some generator sets installed with coolant filter please open the filter s valve before put into use 2 7 Lubricant system Lubricant system is compose...

Страница 15: ...or sets provide base frame style fuel tank for customer The base frame style fuel tank is installed with fuel tank fuel pipes and fuel level indicator This fuel supply system does not need customer to...

Страница 16: ...are required to correctly connect the signal line to this control panel details see the control panel operation manual Automatic transfer panel optional is the automatic transfer switch for transfer...

Страница 17: ...t be connected to an earth ground Since the set is mounted on vibration isolators the ground connection must be flexible to avoid possible breakage due to vibration Ground connection cables or straps...

Страница 18: ...tart Part of the generator set control panel has been furnished with idle speed full speed transfer switch users can choose if the engine need to be started in idle speed or in one time full speed Usu...

Страница 19: ...ing situation and if there is any malfunction warning generator set shut down etc Only when the correct and complete record for running maintenance has been kept very well the user can get correct and...

Страница 20: ...number 3 times the Alarm LCD would flash If you need to restart wait at least 30 seconds before the retry 8 Check the reading of Voltage Meter and Frequency Meter by operating the Voltmeter Change Ov...

Страница 21: ...ight means AMF controller is active then user can select operation type OFF MAN AUTO MEASUREMENT A OFF mode Start stop mains power on off generator set power on off is inactive in this mode B MAN mode...

Страница 22: ...if generator set is used for self start standby power In order to achieve full automatic transfer between mains power and generator set power to guarantee all load present our ATS panel select the bes...

Страница 23: ...O that is OK detail operate step refer module control system ATS PANEL introduction No MODEL 1 ATS switch 2 panel lock 3 mains power output hole 4 generator power output hole 5 communicate with genera...

Страница 24: ...battery For each 50 600 hours of running or at least each 12 months Change lubricant and lubricant filter Because the quality of lubricant oil sulfur content of the fuel and lubricant consumption rate...

Страница 25: ...refer to Control Panel Operation Manual for details 4 5 Start battery Batteries which have been stored in a long time shall be properly charged before being used so that to ensure normal capacitance o...

Страница 26: ...iminate the malfunction s Especially important for new generator set s customer One thing must to be emphasized most of the malfunctions are caused by user s improper installation operation and mainte...

Страница 27: ......

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ......

Страница 33: ......

Страница 34: ......

Страница 35: ...DHY10KE KSE DHY250KE KSE...

Страница 36: ...DHY10KE KSE DHY250KE KSE...

Страница 37: ...DHY10KE KSE DHY250KE KSE...

Страница 38: ...DHY10KE KSE DHY250KE KSE...

Страница 39: ...DHY10KE KSE DHY250KE KSE...

Страница 40: ...DHY10KE KSE DHY250KE KSE...

Страница 41: ...APPENDIX E 1...

Страница 42: ...2...

Страница 43: ...3...

Страница 44: ...running record TIME ENGINE PARAMETER GENERATOR PARAMETER IF RECORD FOR MALFUNCTION IS AVAILABLE OPERATOR REMARK Start stop generator set time Accumulated running time Oil pressure Temperature Voltage...

Страница 45: ...serial No Engine serial No Alternator serial No Accumulated running hours Maintenance cycle Reasons for maintenance periodic maintenance or malfunction maintenance Inspection and repair Inspection an...

Страница 46: ...APPENDIX H...

Страница 47: ......

Страница 48: ...Licensed by Hyundai Corporation Korea For Inquiries Please Contact GRV POWER PRODUCTS S L Avda Alguema 8A 17771 Sta LLogaia Alguema Spain Tf 34 972 67 38 36 www hyundaipower es...

Отзывы: