2.10

 

Electrical

 

Connection

 

Only

 

full

 

qualified

 

and

 

experienced

 

electrical

 

technicians

 

should

 

carry

 

out

 

electrical

 

installation,

 

service

 

and

 

repair

 

work.

 

 

Warning:

 

!

 

Make

 

electrical

 

connections

 

in

 

compliance

 

with

 

relevant

 

electrical

 

codes,

 

standards

 

or

 

other

 

requirements.

 

 

2.10.1

 

Cabling

 

Due

 

to

 

movement

 

of

 

generating

 

sets

 

on

 

their

 

vibration

 

mounts,

 

the

 

electrical

 

connection

 

to

 

the

 

set

 

should

 

be

 

made

 

with

 

flexible

 

cable.

 

The

 

cable

 

must

 

be

 

suitable

 

for

 

the

 

output

 

voltage

 

of

 

the

 

generating

 

set

 

and

 

the

 

rated

 

current

 

of

 

the

 

set.

 

In

 

determining

 

the

 

size,

 

allowances

 

should

 

be

 

made

 

for

 

ambient

 

temperature.

 

Method

 

of

 

installation,

 

proximity

 

of

 

other

 

cables,

 

etc.

 

All

 

connections

 

should

 

be

 

carefully

 

checked

 

for

 

integrity.

 

Current

 

carrying

 

capacity

 

of

 

power

 

cables

 

that

 

will

 

be

 

given

 

in

 

APPENDIX

 

A.

 

On

 

the

 

other

 

hand,

 

there

 

is

 

a

 

one

 

more

 

important

 

point

 

while

 

cable

 

cross

 

sections

 

are

 

being

 

selected.

 

If

 

the

 

distance

 

between

 

load

 

and

 

generator

 

is

 

too

 

length,

 

voltage

 

falling

 

at

 

the

 

load

 

side

 

can

 

be

 

too

 

much

 

at

 

the

 

transient

 

current

 

duration.

 

The

 

voltage

 

drop

 

across

 

a

 

cable

 

can

 

be

 

determined

 

as

 

follows:

 

1000

)

Xsin

Rcos

I

L

3

Δ

U

 

Δ

U

   

Voltage

 

drop

 

(V)

 

L

     

Length

 

of

 

conductors

 

(m)

 

I

     

Rated

 

current

 

(A)

 

R

   

Resistance

 

(

Ω

/km

 

to

 

VDE

 

0102)

 

X

   

Reactance

 

(

Ω

/km

 

to

 

VDE

 

0102)

 

 

Refer

 

to

 

APPENDIX

 

E

 

Cable

 

Current

 

load

 

standard.

 

2.10.2

 

Grounding

 

/

 

Earthing

 

Requirements

 

The

 

frame

 

of

 

the

 

generating

 

set

 

must

 

be

 

connected

 

to

 

an

 

earth

 

ground.

 

Since

 

the

 

set

 

is

 

mounted

 

on

 

vibration

 

isolators,

 

the

 

ground

 

connection

 

must

 

be

 

flexible

 

to

 

avoid

 

possible

 

breakage

 

due

 

to

 

vibration.

 

Ground

 

connection

 

cables

 

or

 

straps

 

should

 

have

 

at

 

least

 

full

 

load

 

current

 

carrying

 

capacity

 

and

 

meet

 

applicable

 

regulations.

 

 

2.10.3

 

Insulation

 

Test

 

Before

 

starting

 

the

 

generating

 

set

 

after

 

installation,

 

test

 

the

 

insulation

 

resistance

 

of

 

the

 

windings.

 

The

 

Automatic

 

Voltage

 

Regulator

 

(AVR)

 

should

 

be

 

disconnected

 

and

 

the

 

rotating

 

diodes

 

either

 

shorted

 

out

 

with

 

temporary

 

links

 

or

 

disconnected.

 

Any

 

control

 

wiring

 

must

 

also

 

be

 

disconnected.

 

A

 

500

 

V

 

Megger

 

or

 

similar

 

instrument

 

should

 

be

 

used.

 

Disconnect

 

any

 

earthing

 

conductor

 

connected

 

between

 

neutral

 

and

 

earth

 

and

 

megger

 

an

 

output

 

terminal

 

to

 

earth.

 

The

 

insulation

 

resistance

 

should

 

be

 

in

 

excess

 

of

 

1M

Ω 

to

 

earth.

 

Should

 

the

 

insulation

 

resistance

 

be

 

less

 

than

 

1M

Ω 

winding

 

must

 

be

 

dried

 

out.

 

 

2.11

 

Power

 

distribution

 

system

 

Our

 

diesel

 

engine

 

generator

 

set

 

use

 

three

 

phase

 

five

 

line

 

system

 

for

 

power

 

distribution.

 

That

 

is,

 

three

 

phase

 

live

 

wires,

 

one

 

neutral

 

line,

 

one

 

ground

 

line.

 

The

 

neutral

 

line

 

and

 

the

 

ground

 

line

 

are

 

not

 

connected.

 

Users

 

can

 

choose

 

three

 

phase

 

four

 

lines

 

for

 

power

 

distribution

 

according

 

to

 

requirement

 

that

 

is

 

to

 

connect

 

the

 

neutral

 

line

 

to

 

the

 

ground

 

(base

 

frame),

 

so

 

that

 

to

 

solve

 

the

 

problem

 

of

 

feint

 

that

 

the

 

neutral

 

line

 

sometimes

 

is

 

electriferous.

   

 

Note:

 

HYUNDAI

 

Power

 

series

 

diesel

 

engine

 

generator

 

sets

 

require

 

users

 

to

 

safely

 

connect

 

generator

 

sets

 

and

 

base

 

frames

 

to

 

the

 

ground,

 

please

 

refer

 

to

 

the

 

ground

 

label

 

for

 

connecting

 

point.

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание DHY11KSE

Страница 1: ...Diesel Generator User Manual...

Страница 2: ......

Страница 3: ...s close to the battery and fuel because the mixture of volatilization from fuel and hydrogen generated by battery charging process will cause explosion when it meets sparkle or naked flame The generat...

Страница 4: ...is running do not attempt to reach under or around the guards to do maintenance or for any other reason Keep hands arms long hair loose clothing and jewelers away from pulleys belts and other moving...

Страница 5: ...al disconnected prior to attempting to connect or disconnect load connections Do not attempt to connect or disconnect load connections while standing in water or on wet or soggy ground Make sure conne...

Страница 6: ...rator Set Working Room 4 2 5 Installation of Generator Set 5 2 6 Cooling system 7 2 7 Lubricant system 8 2 8 Fuel system 8 2 9 Battery 10 2 10 Electrical Connection 11 2 11 Power distribution system 1...

Страница 7: ...andby power supply to provide continue electric power for non invariable loads The generator set is suitable for the area where must ensure continue power supply such as hospitals industrial facilitie...

Страница 8: ...pusher fan and thermostat The alternator has its own internal fan to cool the alternator components 1 6 Electrical System The engine electrical system is 12 volt or 24 volts DC negative ground earth...

Страница 9: ...litated onnect direc valve is an UNDAI Pow n for the rplus lubrica t by openin ransportatio been designe Standard ca fting hole o enerator set canopy roo me which b o have stati the generato Optional...

Страница 10: ...ect to other architecture s foundation The width and depth of foundation shall meet requirement Ensure foundation s levelness and smoothness If possible waste discharge sink can be sued so that the wa...

Страница 11: ...et to outside For example corrugated vibration reduction pipe has been used to connect exhaust pipes air exhaust path fuel inlet pipe fuel return pipe and busbar cable etc all of these parts need to u...

Страница 12: ...ssure and side stress Reserve some space for hot shrinkage and cold expansion Reserve space for generator set vibration Reduce exhaust noise level Overload of exhaust backpressure will cause following...

Страница 13: ...the liquids in a separate container evenly and then add the mixture into the radiator ensure the anti freeze will not freeze under low temperature In the area when there is low possibility of freezing...

Страница 14: ...specification as that existing in the radiator For some generator sets installed with coolant filter please open the filter s valve before put into use 2 7 Lubricant system Lubricant system is compose...

Страница 15: ...or sets provide base frame style fuel tank for customer The base frame style fuel tank is installed with fuel tank fuel pipes and fuel level indicator This fuel supply system does not need customer to...

Страница 16: ...are required to correctly connect the signal line to this control panel details see the control panel operation manual Automatic transfer panel optional is the automatic transfer switch for transfer...

Страница 17: ...t be connected to an earth ground Since the set is mounted on vibration isolators the ground connection must be flexible to avoid possible breakage due to vibration Ground connection cables or straps...

Страница 18: ...tart Part of the generator set control panel has been furnished with idle speed full speed transfer switch users can choose if the engine need to be started in idle speed or in one time full speed Usu...

Страница 19: ...ing situation and if there is any malfunction warning generator set shut down etc Only when the correct and complete record for running maintenance has been kept very well the user can get correct and...

Страница 20: ...number 3 times the Alarm LCD would flash If you need to restart wait at least 30 seconds before the retry 8 Check the reading of Voltage Meter and Frequency Meter by operating the Voltmeter Change Ov...

Страница 21: ...ight means AMF controller is active then user can select operation type OFF MAN AUTO MEASUREMENT A OFF mode Start stop mains power on off generator set power on off is inactive in this mode B MAN mode...

Страница 22: ...if generator set is used for self start standby power In order to achieve full automatic transfer between mains power and generator set power to guarantee all load present our ATS panel select the bes...

Страница 23: ...O that is OK detail operate step refer module control system ATS PANEL introduction No MODEL 1 ATS switch 2 panel lock 3 mains power output hole 4 generator power output hole 5 communicate with genera...

Страница 24: ...battery For each 50 600 hours of running or at least each 12 months Change lubricant and lubricant filter Because the quality of lubricant oil sulfur content of the fuel and lubricant consumption rate...

Страница 25: ...refer to Control Panel Operation Manual for details 4 5 Start battery Batteries which have been stored in a long time shall be properly charged before being used so that to ensure normal capacitance o...

Страница 26: ...iminate the malfunction s Especially important for new generator set s customer One thing must to be emphasized most of the malfunctions are caused by user s improper installation operation and mainte...

Страница 27: ......

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ......

Страница 33: ......

Страница 34: ......

Страница 35: ...DHY10KE KSE DHY250KE KSE...

Страница 36: ...DHY10KE KSE DHY250KE KSE...

Страница 37: ...DHY10KE KSE DHY250KE KSE...

Страница 38: ...DHY10KE KSE DHY250KE KSE...

Страница 39: ...DHY10KE KSE DHY250KE KSE...

Страница 40: ...DHY10KE KSE DHY250KE KSE...

Страница 41: ...APPENDIX E 1...

Страница 42: ...2...

Страница 43: ...3...

Страница 44: ...running record TIME ENGINE PARAMETER GENERATOR PARAMETER IF RECORD FOR MALFUNCTION IS AVAILABLE OPERATOR REMARK Start stop generator set time Accumulated running time Oil pressure Temperature Voltage...

Страница 45: ...serial No Engine serial No Alternator serial No Accumulated running hours Maintenance cycle Reasons for maintenance periodic maintenance or malfunction maintenance Inspection and repair Inspection an...

Страница 46: ...APPENDIX H...

Страница 47: ......

Страница 48: ...Licensed by Hyundai Corporation Korea For Inquiries Please Contact GRV POWER PRODUCTS S L Avda Alguema 8A 17771 Sta LLogaia Alguema Spain Tf 34 972 67 38 36 www hyundaipower es...

Отзывы: