7-50
WIRING, GAUGES
WIRING, GAUGES
C h e c k r e g u l a r l y a n d r e p a i r l o o s e o r
malfunctioning gauges when found.
Open
Loose
8. ELECTRICAL SYSTEM
8. ELECTRICAL SYSTEM
1)
1)
160D7MI56
OFF
TCU
Master switch
Battery
ECU
Cluster
MCU
WELDING REPAIR
WELDING REPAIR
Before start to welding, follow the below
procedure.
Shut off the engine and remove the start switch.
Disconnect ground cable from battery by master
switch.
Before carrying out any electric welding on the
truck, the battery cables should be disconnected
and the connectors pulled out of the electronic
control units (MCU, ECM, TCU, cluster etc).
Connect the earth (ground) lead of the welding
equipment as close to the welding points as
possible.
Do net weld or flame cut on pipes or tubes
Do net weld or flame cut on pipes or tubes
that contain flammable fluids. Clean them
that contain flammable fluids. Clean them
thoroughly with nonflammable solvent before
thoroughly with nonflammable solvent before
welding or flame cutting on them.
welding or flame cutting on them.
Do not attempt to welding work before carry
Do not attempt to welding work before carry
out the above.
out the above.
If not, it will caused serious damage at
If not, it will caused serious damage at
electric system.
electric system.
2)
2)
(1)
(2)
(3)
(4)
※
160D9LMI57