816 LA Actuator
INSTALLATION REFERENCE MANUAL
4
• DISCONNECT POWER AT THE CONTROL PANEL BEFORE MAKING ANY ELECTRIC SERVICE POWER
CONNECTIONS.
• BE AWARE OF ALL MOVING PARTS AND AVOID CLOSE PROXIMITY TO ANY PINCH POINTS.
Below is a list of tools necessary for installation of the 816 actuator:
• Welder (for pivot arm) unless optional bolt-on pivot arm (P/N 446) is used.
• Basic hand tools (screwdrivers, wrenches, pliers, etc..)
• Bubble Level (for ensuring pivot arm and actuator are level).
• Framing square (for determining pivot arm location)
IMPORTANT!
•
The gate operator installation is NOT a “do-it-yourself” project. Contract a qualified gate operator instal
-
lation company to install this system to ensure a safe and reliable installation.
•
It is the responsibility of the property owner to ensure the installer is qualified to carry out the installation
in a safe and professional manner.
• Consult local government agencies for up-to-date rules and regulations to satisfy licensing, codes or
regulations that regulate automated gate system design and installation.
• The gate for which the gate operator is intended to be used should itself be installed correctly so that it
is level and plumb and the gate opens easily and evenly.
• Note that Nice swing gate systems are not intended for installation on an incline.
SECTION 2: INSTALLATION SAFETY
SECTION 3: TOOLS NEEDED FOR INSTALLATION
WARNING!
READ ALL SAFETY INFORMATION IN THE CONTROL BOX INSTALLATION MANUAL WHEN
INSTALLING A SWING GATE SYSTEM!
www.ApolloGateOpeners.com | (800) 878-7829 | [email protected]