
Installation and Maintenance Manual
6
Tools Required for an Efficient Installation
5. Hammer
6. Screwdriver sets,
Straight and Phillips
7. Wrench set, open end,
1
/
4
" through 1"
8. Electric drill and bits,
1
/
8
" through
3
/8"
9. Roto-hammer and bits,
3
/
8
" &
1
/
2
"
10. Level—it doesn’t need to look
like this one, but the installation
needs to be level!
11. Two pair wide jaw vice
grip pliers, or two C clamps,
4" capacity
4. Allen wrench set
3. Concrete anchor
bolts, four
1
/
2
" x 4"
2. Carpenters
pencil or crayon
1. Chalkline or other
builders string
Содержание HTG 320-2
Страница 18: ...Installation and Maintenance Manual 10 Components of the Barrier Arm Gate Operator ...
Страница 21: ...Installation and Maintenance Manual 13 46 ...
Страница 22: ...Installation and Maintenance Manual 14 46 ...
Страница 23: ...Installation and Maintenance Manual 15 ...
Страница 43: ...Installation and Maintenance Manual 35 E95 ...
Страница 48: ...Installation and Maintenance Manual 40 24 hr 7 day Timer Connection to Smart Touch Controller ...
Страница 56: ...Installation and Maintenance Manual 48 D C POWER BATTERY PACK 2 BATTERY 110AH 30 H X 30 W X 12 D ...
Страница 57: ...Installation and Maintenance Manual 49 24V 110A H BATTERY POWER SUPPLY FOR DC OPERATORS ...
Страница 59: ...Installation and Maintenance Manual 51 ...
Страница 60: ...Installation and Maintenance Manual 52 Parts Breakout ...
Страница 61: ...Installation and Maintenance Manual 53 Parts Breakout ...
Страница 62: ...Installation and Maintenance Manual 54 Parts Breakout AC Pumps MX000234 HVABY 000 CRT ...
Страница 63: ...Installation and Maintenance Manual 55 Parts Breakout DC Pumps MX000234 HVABY 000 CRT ...
Страница 64: ...Installation and Maintenance Manual 56 Parts Breakout ...
Страница 67: ...Installation and Maintenance Manual 59 Smart Touch Controller Connections ...
Страница 68: ...Installation and Maintenance Manual 60 Quick StrongArm Brake Valve adjustment Procedure ...