ORDER OF PRE-OPERATIONAL
PROCEDURES
Attention.
Before installing or assembling the MasterBox, double-check that the
components seem to be in good working order. The MasterBox should not have any
cracks, dents or other visual damage.
Contact your supplier if you notice any irregularities during your component check
.
Important. If the MasterBox has been stored in low temperatures, leave it indoors
for at least 2 hours before use to avoid moisture condensing on its internal
components. This may cause damage to the MasterBox.
Pre-operation procedures order
In order to use the MasterBox the following procedures must be performed:
Table 6. Pre-operation procedures
STEPS
DESCRIPTION
1.
Assemble the Device(s).
2.
Install the Device /
MasterBox (alternatively) /
Wall Devices (according to the
selected Wall installation pattern).
Device Operating Manual /
Section 5 of this Manual /
3.
If a number of Devices is used,
connect the Devices one by one
using sync cables.
See Picture 5
4.
Assemble the MasterBox.
Section 6 of this Manual.
5.
Register your CMS account.
Device Operating Manual.
6.
You may activate the MasterBox and
then the Device(s) (recommended)
or
activate the Device(s) and then
activate the MasterBox.
Section 7 of this Manual.
Device Operating Manual or the
and section 7 of this Manual.
7.
Update the Device(s) stator
firmware.
See section 8.
8.
Upload a content to the MasterBox
and to the Device(s).
and section 9 of
this Manual.