
MAINTENANCE AND PARTS
1
5-14
powermax30
Operator Manual
5. The work lead may be knotted to adjust the length of the wire inside the power supply. If so,
untie the knot and then thread the work lead through the opening in the end cap.
6. Thread the connector end of the new work lead through the end cap and fit the strain relief
into the hole in the front endcap. Unscrew the strain relief to loosen it if you need to adjust the
amount of work lead on either side of it.
7. Slide the nut over the work lead connector. Gently tilt the end cap away from the power supply
and screw the nut onto the strain relief.
8. Attach the work lead to the power board at J22 using the screw and washer that you removed
earlier. The torque setting for this connection is 20 inch-pounds (1.4 kg cm)
9. Replace or realign the end cap.
10. Replace the Nomex barrier and slide the cover back onto the power supply. Position the
handle over the holes in the top of the cover, then use the 2 screws to secure the cover.
11. Reconnect the electrical power and the gas supply.
PMX30_OM_05.qxp:PMX30_OM_05 10/7/09 12:46 PM Page 5-14
Содержание Powermax30 AIR
Страница 12: ...TABLE OF CONTENTS viii powermax30 Operator Manual PMX30_OM_FM qxp PMX30_OM_FM 10 7 09 12 43 PM Page viii ...
Страница 24: ...1 12 Hypertherm 11 08 SAFETY ...
Страница 36: ...11 08 1a 12 Hypertherm SÉCURITÉ ...
Страница 48: ...11 08 SEGURIDAD 1b 12 Hypertherm ...
Страница 54: ...SPECIFICATIONS 2 6 powermax30 Operator Manual PMX30_OM_02 qxp PMX30_OM_02 qxd 10 7 09 12 44 PM Page 2 6 ...
Страница 74: ...OPERATION 4 12 powermax30 Operator Manual PMX30_OM_04 qxp PMX30_OM_04 10 7 09 12 45 PM Page 4 12 ...
Страница 98: ...MAINTENANCE AND PARTS 5 24 powermax30 Operator Manual PMX30_OM_05 qxp PMX30_OM_05 10 7 09 12 46 PM Page 5 24 ...