ENGINE 3-40
◉
TRANSMISSION
●
Install the transmission.
●
Install the gearshift cam
④
, and gearshift fork shaft
⑤, ⑥
.
◉
GEARSHIFT CAM AND
GEARSHIFT FORKS
●
Install the gearshift fork NO.1
①
, NO.2
②
, and NO.3
③
.
●
Install the dowel pins
⑦
.
●
Before assembling the crankcase, apply the engine
oil to each gear and bearing.
①
②
③
①
②
③
④
⑦
⑦
⑤
⑥
Содержание Aquil GV650
Страница 4: ...NOTE Difference between photographs and actual motorcycles depends on the markets...
Страница 12: ...1 7 GENERAL INFORMATION EXTERIOR ILLUSTRATION...
Страница 104: ...CARBURETOR 4 3 FUEL SYSTEM...
Страница 140: ...LAMP HEADLAMP TURN SIGNAL LAMP TAIL BRAKE LAMP ELECTRICAL SYSTEM 6 16...
Страница 165: ...CHASSIS 7 20 FRONT FORK...
Страница 183: ...CHASSIS 7 38 REMOVAL Remove the rear shock absorbers by removing their bolts and nuts REAR SHOCK ABSORBER...
Страница 222: ...Prepared by HYOSUNG MOTORS MACHINERY INC 1st Ed JUL 2005 Manual No 99000 51210 Printed in Korea...