Page 67
Functions
5-1
Switch stand-
by heating
Stand-by heating is enabled or not (0= off, 1=on).
5-2
Interval stand-
by heating
5-3
On-time
Stand-by heat-
ing
5-4
Basic relay
allocation
The base relay provides a potentialfree two-way con-
tact at terminals 28, 29 and 30 (rated load: 250V/8A).
It is activated if certain operational conditions apply.
The operational condition “collective fault” is preset.
The following allocations are supported:
It is possible to associate another operational condition
with the base relay circuit, also see Section: “Summary
Table of Parameters” on Page 56, “Parameter E5.”
(2) No demand: input signal creates no demand.
(3) Humidifying: humidifying is active.
(5) Remote off:
(30) Filling off: .
(31) Filling on: filling.
Functions
5-4
Basic relay
allocation
(contd.)
(37) HyCool: Relay is energised for switching on
HyCool-function solenoid valve.
(60) Blow-down off: .
(61) Blow-down on: pumping takes place.
(62) Partial blow-down: a partial blow-down is run.
(63) Full blow-down: .
(66) Max. level:
(67) Stand-by blow down: .
(68) Dead leg blow-down: .
(69) Start-up blow-down: relay is energised when a
start-up blow-down is run.
(270) Collective Service: Relay is energised when a
service message status („Service steam amount“, „Ser-
vice main contactor K1 switching cycles“) is active.
Group
Par.
Denomination
Description