HydroTherm KN-2 Скачать руководство пользователя страница 25

P/N 42-9540 11/12 Copyright 2012 Hydrotherm

Page 25 

KN INSTALLATION INSTRUCTIONS FOR VENT AND AIR PIPING

Vent and air piped through a side wall 

(concentric termination)

6

7 — Sidewall concentric vent-air termination

 

See Table 6 for part numbers of the sidewall termination components required for 
EZ-Seal vent pipe installations. Th e vent termination must be constructed using 
the stainless steel vent materials listed in Table 5 to ensure the confi guration is 
correct. DO NOT terminate the air piping with any other method.
A. 

Wall plates (2 required)

 — Use only the plates listed in Table 6. Follow the 

vent manufacturer’s instruction to prepare the wall and mount the plates.
Th e air space provided by the design of the SC type vent allows the concentric 
vent/air pipe to be run directly through combustible or noncombustible 
walls. No thimble is needed unless specifi ed by applicable codes.
Aft er the pipe (item 

B

) is inserted and placed, follow the vent manufacturer’s 

instructions to insert self-tapping screws through the four tabs in each of the 
wall plates into the holes in the pipe. Th is secures the pipe in place.
Follow the vent pipe manufacturer’s instructions for sealing around the plates 
and the pipe.

B.  Length of concentric vent pipe

 — Use a 1-foot length of vent pipe as 

listed in Table 6 unless the wall penetration quires a longer length. If a longer 
length is required, use a length of Heat-Fab type SC vent long enough for the 
application.

C.  Air intake tee

 — Th e air intake tee provides a connection for the air piping to 

feed air through the outer plenum of the type SC vent and fi tt ings. Secure the 
vent pipe to the end following the vent pipe manufacturer’s instructions for 
assembling joints. Att ach the air pipe to the air connection using silicone RTV 
to seal the joint.

D. Termination 

adapter

 — Assembly the termination adapter to the type SC 

pipe, following the vent pipe manufacturer’s instructions for making the joint.

E. Termination 

screen

 — Apply a bead of silicone RTV to the male end of the 

screen fi tt ing before inserting into the adpatper. Bend the adpater tabs over the 
end of the screen fi tt ing.

 

Termination locations

 — Place all terminations so they meet the clearances 

shown in Figure 21.

Multiple boiler installations

 

Install multiple vent/air terminations through the side wall following all guidelines 
for single-vent/air installations.

 

Install the terminations so they are no closer than 2 feet 

(0.6 m)

 on horizontal 

centers and 4 feet on vertical centers (Figure 22).

 

 All terminations must comply with minimum clearances shown in Figure 21.

Figure 20 

Sidewall concentric vent-air termination

Содержание KN-2

Страница 1: ...stantial property damage The boiler can only be operated with a dust freeairsupply Followtheinstructionmanualprocedurestoductairtotheboilerairintake Iftheboilerhasbeencontaminatedbyoperation with cont...

Страница 2: ...pingcomponentforHeat fabventpipe orgearclampsforvent pipe Neverusescrewsintheventpiping ScrewsareonlyappliedtotheairpipingportionofHeat fabSC concentric vent used for concentric vent air sidewall term...

Страница 3: ...KN 2 Vent components Heat Fab KN 4 Vent components Heat Fab Vent piping components incl supports thimbles etc EZ Seal 3 inch Vent piping components incl supports thimbles etc EZ Seal 4 inch Rain cap...

Страница 4: ...s Heat Fab Air components Heat Fab Termination elbow Same as vent termination Termination elbow Same as vent termination Air piping components also supports thimbles etc 3 inch PVC CPVC ABS galvanized...

Страница 5: ...rials could result in vent system failure Exposed vent pipe poses a potential burn hazard to people and pets Insulate or shield the pipe where necessary to prevent risk Never drill through or install...

Страница 6: ...piping completely DO NOT use the boiler vent connection to support the vent piping Provide support straps from the ceiling and pedestal supports from the floor utilize noncombustible saddle This is re...

Страница 7: ...operly install the vent piping could result in flue gas leakage causing possible severe personal injury death or substantial property damage Code compliance Follow all applicable local codes when inst...

Страница 8: ...se installations 3 4 Support the vent piping completely DO NOT use the boiler vent connection to support the vent piping Provide support straps from the ceiling and pedestal supports from the floor ut...

Страница 9: ...ding flexible aluminum duct if desired Whenusingmetallicpiping sealallofthelongitudinalseamjointsin addition to the component joints Attach the air piping to the boiler air connection requiring use of...

Страница 10: ...ar clamp manufactured by the vent manufacturer see Table 2 Slide the clamp over the male end of the pipe after the pipe has been inserted from outside From the inside pull the pipe so it is firmly aga...

Страница 11: ...roperly install the vent piping could result in flue gas leakage causing possible severe personal injury death or substantial property damage Code compliance Follow all applicable local codes when ins...

Страница 12: ...3 4 Support the vent piping completely DO NOT use the boiler vent connection to support the vent piping Provide support straps from the ceiling and pedestal supports from the floor utilizing noncombus...

Страница 13: ...ping sealallofthelongitudinalseamjointsin addition to the component joints Attach the air piping to the boiler air connection requiring use of silicone RTV to seal the connection If the boiler room ai...

Страница 14: ...If a longer length is required use a length of EZ Seal long enough for the application Attach the air piping to the male end bottom end of the stainless steel pipe C Roof penetration components Use th...

Страница 15: ...ode compliance Follow all applicable local codes when installing the vent system Where codes differ from this manual followcoderequirements ContactHydrothermifyou have any questions regarding the inst...

Страница 16: ...late the vent piping where it passes through unheated areas to prevent condensate freeze up Do not insulate the within 18 inches of the termination when it passes through a combustible wall If the pip...

Страница 17: ...application Insert the pipe from OUTSIDE male end first The pipe will stop at the raised section of the female end C Gear clamp Use a hose clamp or a gear clamp manufactured by the vent manufacturer s...

Страница 18: ...IONS FOR VENT AND AIR PIPING Figure 12 Termination minimum clearances Vent piped through a side wall combustion air from the boiler room cont 4 Figure 13 Using external piping to raise the termination...

Страница 19: ...ual followcoderequirements ContactHydrothermifyou have any questions regarding the installation Terminate the vent and air piping following the guidelines in this manual Avoid vent termination locatio...

Страница 20: ...ler Install at least one support on every horizontal run For horizontal runs longer than 5 feet 1 5 m install a support every 3 feet 0 9 m Ventpipingcannotbesupportedfromabove suchasrelyingonroofjacks...

Страница 21: ...IDE male end first The pipe will stop at the raised section of the female end C Gear clamp Use a hose clamp or a gear clamp manufactured by the vent manufacturer see Table 5 Slide the clamp over the m...

Страница 22: ...16 Vent termination minimum clearances see Figure 18 for required spacing between vent and air terminations Figure 17 Using external piping to raise the termination Figure 18 Minimum spacing between v...

Страница 23: ...s likely to be affectedbywinds snowdrifts peopleandpets Protectbuilding materials and vegetation from degradation caused by the flue gases and condensation Vent piping see Figure 19 1 Boiler vent conn...

Страница 24: ...on every horizontal run For horizontal runs longer than 5 feet 1 5 m install a support every 3 feet 0 9 m Ventpipingcannotbesupportedfromabove suchasrelyingonroofjacksections You must install supports...

Страница 25: ...nd the pipe B Length of concentric vent pipe Use a 1 foot length of vent pipe as listed in Table 6 unless the wall penetration quires a longer length If a longer length is required use a length of Hea...

Страница 26: ...e wall concentric termination cont 6 Figure 21 Termination minimum clearances see Figure 22 for required spacing between terminations Figure 22 Minimum spacing between terminations terminations must a...

Страница 27: ...P N 42 9540 11 12 Copyright 2012 Hydrotherm Page 27 KN INSTALLATION INSTRUCTIONS FOR VENT AND AIR PIPING 7...

Страница 28: ...IN UNITED STATES 260 NORTH ELM ST WESTFIELD MA 01085 413 564 5515 FAX 413 568 9613 IN CANADA 7555 TRANMERE DRIVE MISSISSAUGA ONT L5S 1L4 905 672 2991 FAX 905 672 2883 www hydrothermkn com...

Отзывы: