![HydroTherm HeatNet KN-20 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/hydrotherm/heatnet-kn-20/heatnet-kn-20_field-assembly-instructions_2192567027.webp)
27
P/N 42-9551
KN Series Gas-fired direct vent cast iron boilers – Field assembly instructions
Step 78
Install the air box cover
The air box cover MUST be
in place during boiler opera-
tion.
1. Attach the air box cover using the
screws provided.
Step 79
Install the air gas train
shroud
1. Attach the gas train shroud to the
jacket front using the hardware
provided.
Step 80
Follow Boiler Installation
and Operating Instructions manual
and HeatNet Control manual
1. Follow all instructions in both of the
manuals listed. Pipe and wire the
boiler accordingly.
2. Perform the tests indicated in the
manuals.