![HydroTherm HeatNet KN-20 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/hydrotherm/heatnet-kn-20/heatnet-kn-20_field-assembly-instructions_2192567020.webp)
20
P/N 42-9551
KN Series Gas-fired direct vent cast iron boilers – Field assembly instructions
Step 51
Mount the control panel
The control panel mounts on
the mounting clip at the top
of the jacket front panel. The
conduit fitting and the sensor
hose must be routed through
jacket panel.
1. BX conduit fitting — Hold the control
panel close enough to the jacket
front panel to allow inserting the
conduit fitting through the back of
the panel. Then apply and tighten the
fitting lock nut.
2. Feed the sensor hose through the
grommet-fitted hole in the jacket
panel (see second photo).
3. Then clip the control panel to the
mounting bracket.
Step 52
Attach the gas line nipple
to the gas train
1. Apply pipe dope to the gas line
nipple bottom end. REMOVE any pipe
dope from the inside of the pipe.
Step 53
Tighten gas line nipple
Use two wrenches to prevent
damage to gas train compo-
nents.
1. Use two pipe wrenches to tighten the
gas line nipple connection.