![HydroTherm HeatNet KN-20 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/hydrotherm/heatnet-kn-20/heatnet-kn-20_field-assembly-instructions_2192567014.webp)
14
P/N 42-9551
KN Series Gas-fired direct vent cast iron boilers – Field assembly instructions
Step 33
Install the burner
1. Place the burner on top of the section
assembly as shown.
2. The PILOT TUBE must be at the REAR
of the boiler.
Step 34
Install burner bolts
1. Press the burner flange down firmly
and install bolts, washers and nuts
supplied.
2. Place bolts ONLY at the bolt notches
marked in Step 32, page 13.
3. Secure the bolts firmly, but avoid
distorting the burner flange.
Step 35
Position the manifold
1. Place the manifold on top of the
section assembly as shown, with the
blower flange to the FRONT of the
boiler.
Step 36
Install manifold bolts
1. The manifold gasket is pre-attached
to the manifold at the factory.
2. Install a bolt, two flat washers, split
lock washer and nut at each bolt lug
on the manifold.
3. Tighten the bolts only until the split
lock washer is just flattened.