![HydroTherm HeatNet KN-20 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/hydrotherm/heatnet-kn-20/heatnet-kn-20_field-assembly-instructions_2192567024.webp)
24
P/N 42-9551
KN Series Gas-fired direct vent cast iron boilers – Field assembly instructions
Step 66
Install jacket right side
panel
Leather gloves are recom-
mended when handling sheet
metal components. They will
reduce the possibility of cuts
from sheet metal edges.
1. Secure the jacket right side panel in
place using the screws provided.
2. Position the pilot gas tubing in the
slot located in the top right end of
the jacket right side panel.
Step 67
Install jacket top left panel
Leather gloves are recom-
mended when handling sheet
metal components. They will
reduce the possibility of cuts
from sheet metal edges.
1. Mount the jacket top left panel to the
boiler using the screws provided.
2. The openings in this panel are used
to install controls in the boiler top left
tappings.
Step 68
Mount controls in top left
tappings
1. There are 11 tappings in the top left
— 1¼-inch tappings at the front and
rear of the boiler — the (9) tappings
in between are all 1 inch.
2. Rear tapping — install the boiler relief
valve.
3. Second tapping from the rear —
mount the manual reset limit control.
4. Third tapping from the rear — mount
the automatic air vent.
5. Sixth tapping from rear — mount the
remote low water cutoff probe and
J-box.
6. Front tapping — mount the pressure/
temperature gauge.
7. All other tappings — install 1-inch
plugs.
Step 69
Install left side junction
box
1. Connect the three BX conduits (from
the front, top and rear of the boiler) to
the left side junction box, provided.
2. The wires are both color-coded and
numbered.
3. Connect the wires together, matching
color/number.
4. Install the junction box cover.