Gas-Fired Direct Vent Cast Iron Boilers – Field Assembly Instructions
20
Step 45
Replace access panels on blower housing
1. Re-install all access panels on the
blower housing.
Step 46
Complete wiring
1. Obtain the HeatNet display panel
assembly.
2. Complete all wiring connections from
the control panel to the display panel
components.
3. Mount the display panel and the control
enclosure front panel.
4. Complete all wiring connections and
secure conduit ends.
5. Install the control enclosure cover panel,
electrical cover panel and gas train
cover panel.