6
VACUUM INSTALLATION
1 -
Power to the hydromassage bathtub must be turned OFF
and all water must be drained from
the bathtub before proceeding.
2 -
Loosen nuts and remove Heater Ready fitting and existing gaskets (see Fig. 11).
3 -
Remove the new heater gaskets included with your Pure Heat heater and install them onto the
plumbing tailpieces, making sure the gasket ridge is seated in the tailpiece groove (see Fig. 12).
TAILPIECE
GASKET
PLUMBING
4 -
You are now ready to install the heater in the open space where the Heater Ready fitting was located
(ensure that the gaskets remain in place). Slide both heater nuts inward toward the center of the
heater to expose the mating surfaces of the heater housing. Slide the heater carefully into place
between the tailpieces and gaskets and hand-tighten heater nuts. If you use a wrench be careful not
to over-tighten, the nuts can crack (see Fig. 13).
Fig. 12
Fig.13
Fig. 11
HEATER READY
ASSURE YOU ARE INSTALLING
A VACUUM MODEL FOR THIS
LOCATION
CONTINUE ON TO PAGE 12
“BONDING YOUR HEATER”
Heater Ready Fitting Installed
-UV SERIES
VACUUM
www.bathheaters.com