Page 22
7.2
Vortex wall module assembly
The vortex module wall provides firstly the air turbulence and
secondly it holds the atomiser nozzles and water distributor.
The vortex module wall is supplied as specified (please note the
number of vortex modules in width and height), assembled in the
accompanying nozzle assembly data sheet:
»
The Vortex modules are slotted together piece by
piece, starting at the bottom right
The bottom right vortex module must be so positioned that the
right hand and lower side is flat surface up while the other two
sides show the guide bars (1).
7.3
Assembling the vortex module wall
Two guide rails are required for assembly of the vortex module
wall.
We recommend to have an air gap sideways between the vortex
module wall and the housing wall as it generates a laminar air
flow and prevents moisture build-up on the walls.
7.3.1
Guide rails for the vortex module wall:
In order to position the vortex module wall in the humidification
chamber guide rails are required. The guide rails are fixed to the
ceiling and the floor of the humidification chamber.
The guide rails must be installed in a way that makes it possible
to either pull out of or lift up the vortex module wall and stagnant
water is prevented.
Ensure that after installation the floor of the humidification cham-
ber is leackage-free.
1
Содержание LPS
Страница 1: ...LPS Humidifies and Cools ÁLPS Ä4 3Ö ENhÈ LPS 20130619 EN Operating manual ...
Страница 37: ...Page 37 8 Dimensions Pump Station View from below Side view Rear view ...
Страница 62: ...Page 62 14 2 3 1 Menu structure and parameter setting 4 3 ...
Страница 63: ...Page 63 15 EC declaration of conformity ...
Страница 69: ...Page 69 4 3 ...