![HydroHoist HarborHoist 12000 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/hydrohoist/harborhoist-12000/harborhoist-12000_operation-manual_2192174009.webp)
Rev A 2003215
Tie Off Mooring Information
(Mooring ropes not included)
Tie the lift off using a tie off method similar to mooring a boat in a slip. The goal is to restrain the lift as
much as possible but still leaving enough slack in the lines that the lift can still raise and lower properly.
Use a good mooring rope that has enough strength for the size of boat and lift you are installing.
Minimum
Rope Dia. of 3/8” for boats up to 25’
,
1/2” for boats up to 35’
, and
5/8” for boats up to 45’
.
There are several variables involved in rope selection and tie of locations so be sure that you check the
mooring regularly for any changes in rope condition, tie off points, etc.
Be sure that all tie off points are in good condition and are structurally sound enough to handle the load the
mooring will apply.
Recommended: Double Braid Nylon Dock lines.
Содержание HarborHoist 12000
Страница 1: ...Rev A 2003215...
Страница 11: ...Rev A 2003215 CB of 6600 CB of 8800 CB of 8800 Short...
Страница 12: ...Rev A 2003215 CB of 12000 CB of 15000 CB of 18000...
Страница 13: ...Rev A 2003215 CB of 20000 CB of 25000...