23
Rev. 07142020
STEP 6(b): TANK AND WALKWAY ALIGNMENT AND ATTACHMENT
1.
Place the Spacer Tubes between the outside set of U
-
Bolts on the first and last tanks sets. See
Figure B
be-
low.
2.
Place Span Beams between the U
-
Bolt sets on the connecting tanks. See
Figure C
below.
3.
Starting with tank Set 3, loosely attach the walkway support on top of the span beam, as illustrated below.
Ensure the U
-
Bolts are centered in the middle of the walkway slots on the walkway support.
As walkway
supports are added to the other tank sets, the U
-
Bolts will shift outward in the walkway slots.
Add walk-
way supports to from the inner tanks sets to the outer ones. Thus working from the middle out. See
Figure
A
.
4.
Confirm the Span Beams are centered between the two tanks and the Spacers are in the proper position.
Wait to tighten all hardware on the walkway until you have completed Step 6(c).
If you use a Single
-
Sided Tie
-
Off method for mooring, the Spacer Tubes must be removed in a later step. Do
not tighten the U
-
Bolts fastening the walkway over the spacers. Refer to STEP 15: TIE
-
OFF MOORING.
Span Beam installed between U
-
Bolts on connecting tanks
Walkway Support
Walkway Slots
Figure C:
Span Beam
Spacer Tube installed between the outside
set of U
-
Bolts on front and rear tank sets
Figure B:
Spacer Tube
Brass Nut
3/8”
Lock Washer
3/8”
Flat Washer
3/8”
Figure A:
Tank Walkway Connection
Part #
Parts Required (Per Tank Set)
HH
-
LPL
-
1033
Aluminum Spacer Tube (3 X 3)
HH
-
LPL
-
1034
Beam
-
48in Span—Alum. HH.
HH
-
2515
Walkway Support
Part #
Hardware Required (Per Tank Set)
HH
-
LPL
-
1505
Lock Washer
(3/8”
SS)
HH
-
1975
Brass Nut (3/8
-
16)
2090242
Flat Washer
(3/8”
SS)
Use Kit Box: #HH
-
2650
Содержание 18000 Long
Страница 1: ...1 Rev 07142020...
Страница 48: ...48 Rev 07142020 Appendix...
Страница 51: ...51 Rev 07142020...