background image

First Defense

®

 Operation and Maintenance Manual

First Defense

®

 Operation and Maintenance Manual

Hydro International

 (Stormwater), 94 Hutchins Drive, Portland ME 04102

Tel: (207) 756-6200 Fax: (207) 756-6212 Web: www.hydro-int.com

1

4

6

7

2

3

5

8

II. Model Sizes & Configurations

The First Defense

®

 inlet and internal bypass arrangements are available in several model sizes and configurations. The components 

of the First Defense

®

-4HC  and  First  Defense

®

-6HC  have  modified  geometries  as  to  allow  greater  design  flexibility  needed  to 

accommodate various site constraints. 

Page | 4

Page | 5

III. Maintenance

Overview

The First Defense

®

 protects the environment by removing a wide range of pollutants from stormwater runoff.   Periodic removal of 

these captured pollutants is essential to the continuous, long-term functioning of the First Defense

®

.  The First Defense

®

 will capture 

and retain sediment and oil until the sediment and oil storage volumes are full to capacity.  When sediment and oil storage capacities 
are reached, the First Defense

®

 will no longer be able to store removed sediment and oil.  Maximum pollutant storage capacities are 

provided in  Table 1.

The First Defense

®

 allows for easy and safe inspection, monitoring and clean-out procedures.  A commercially or municipally owned 

sump-vac is used to remove captured sediment and floatables.  Access ports are located in the top of the manhole.  

Maintenance events may include Inspection, Oil & Floatables Removal, and Sediment Removal.  Maintenance events do not require 
entry into the First Defense

®

, nor do they require the internal components of the First Defense

®

 to be removed.  In the case of 

inspection and floatables removal, a vactor truck is not required.  However, a vactor truck is required if the maintenance event is to 

include oil removal and/or sediment removal.       

Maintenance Equipment Considerations

The internal components of the First Defense

®

-HC have a centrally located circular shaft through which the sediment storage sump 

can be accessed with a sump vac hose. The open diameter of this access shaft is 15 inches in diameter (Fig.3). Therefore, the nozzle 
fitting of any vactor hose used for maintenance should be less than 15 inches in diameter. 

Determining Your Maintenance Schedule

The frequency of clean out is determined in the field after installation.  During the first year of operation, the unit should be inspected 
every six months to determine the rate of sediment and floatables accumulation.  A simple probe such as a Sludge-Judge

®

 can be 

used to determine the level of accumulated solids stored in the sump.  This information can be recorded in the maintenance log (see 
page 9) to establish a routine maintenance schedule.  

The vactor procedure, including both sediment and oil / flotables removal, for a 6-ft First Defense

®

 typically takes less than 30 minutes 

and removes a combined water/oil volume of about 765 gallons. 

Table 1. 

First Defense

®

 Pollutant Storage Capacities and Maximum Clean out Depths

First 

Defense

®

 

Model 

Number

Diameter

Oil Storage 

Capacity 

Oil Clean Out 

Depth

Maximum Sediment 

Storage Capacity

1

Recommended Sediment 

Clean-out Capacity

Volume

Depth

Volume

Depth

(ft / m)

(gal / L)

 (in / cm)

(yd

/ m

3

)

(in / cm)

(yd

/ m

3

)

(in / cm)

FD-4

4 / 1.2

180 / 681

<23.5 / 60

1.3 / 1.0

33 / 84

0.7 / 0.5

18 / 46

FD-4HC

191 / 723

<24.4 / 62

FD-6

6  / 1.8

420 / 1,590

<23.5 / 60

3.3 / 2.5

37.5 / 95

1.6 / 1.2

18 / 46

FD-6HC

496 / 1,878

<28.2 / 72

  NOTE

  1

 Sediment storage capacity and clean out depth may vary, as larger sediment storage sump volumes are provided when required.  

First Defense

®

 Components

1.   Built-In Bypass
2.   Inlet Pipe

3.   Inlet Chute

 

4.   Floatables Draw-off Port
5.   Outlet Pipe

6.   Floatables Storage

a.

Fig.3 The central opening to the sump of the First Defense

®

-HC is 15 inches in diameter. 

15-in Maintenance Access

b.

1

2

3

4

5

6

7

8

(not pictured)

Fig.2a) First Defense

®

-4 and First Defense

®

-6; b) First Defense

®

-4HC and First Defense

®

-6HC, with  higher capacity dual internal 

bypass and larger maximum pipe diameter.

All First Defense

®

 models include the internal components that are designed to remove and retain total suspended solids (TSS), 

gross solids, floatable trash and hydrocarbons (Fig.2a - 2b). First Defense

®

 model parameters and design criteria are shown in 

Table 1.

7.   Sediment Storage
8.   Inlet Grate or Cover

Содержание First Defense

Страница 1: ......

Страница 2: ......

Страница 3: ......

Страница 4: ...Operation and Maintenance Manual First Defense and First Defense HC Vortex Separator for Stormwater Treatment Stormwater Solutions Turning Water Around ...

Страница 5: ...a wide range of pipe sizes peak flows and depth constraints Operation The First Defense operates on simple fluid hydraulics It is self activating has no moving parts no external power requirement and is fabricated with durable non corrosive components No manual procedures are required to operate the unit and maintenance is limited to monitoring accumulations of stored pollutants and periodic clean...

Страница 6: ...ose The open diameter of this access shaft is 15 inches in diameter Fig 3 Therefore the nozzle fitting of any vactor hose used for maintenance should be less than 15 inches in diameter Determining Your Maintenance Schedule The frequency of clean out is determined in the field after installation During the first year of operation the unit should be inspected every six months to determine the rate o...

Страница 7: ...ones etc Crow bar or other tool to remove grate or lid Pole with skimmer or net if only floatables are being removed Sediment probe such as a Sludge Judge Vactor truck flexible hose recommended First Defense Maintenance Log Floatables and sediment Clean Out Procedures 1 Set up any necessary safety equipment around the access port or grate of the First Defense as stipulated by local ordinances Safe...

Страница 8: ...CLE ALL THAT APPLY GRATED INLET CATCH BASIN INLET PIPE FLOW THROUGH First Defense Inspection and Maintenance Log Initials Depth of Floatables and Oils Sediment Depth Measured Volume of Sediment Removed Site Activity and Comments Date Hydro International Stormwater 94 Hutchins Drive Portland ME 04102 Tel 207 756 6200 Fax 207 756 6212 Web www hydro int com Hydro International Stormwater 94 Hutchins ...

Страница 9: ... Operation and Maintenance Manual First Defense Operation and Maintenance Manual Hydro International Stormwater 94 Hutchins Drive Portland ME 04102 Tel 207 756 6200 Fax 207 756 6212 Web www hydro int com NOTES Notes ...

Страница 10: ...s Hydro Experience it is the essence of Hydro It s interwoven into every strand of Hydro s story from our products to our people our engineering pedigree to our approach to business and problem solving HX is a stamp of quality and a mark of our commitment to optimum process performance A Hydro solution is tried tested and proven There is no equivalent to Hydro HX FD_O M_D1502 ...

Отзывы: