background image

First Defense

®

 Operation and Maintenance Manual

First Defense

®

 Operation and Maintenance Manual

Hydro International

 (Stormwater), 94 Hutchins Drive, Portland ME 04102

Tel: (207) 756-6200 Fax: (207) 756-6212 Web: www.hydro-int.com

I. First Defense

®

 by Hydro International

Table of Contents

First Defense

®

 by Hydro International

 

- Introduction

 

- Operation

 

- Pollutant Capture and Retention

Model Sizes & Configurations

 

- First Defense

®

 Components

5 Maintenance
 

- Overview

 

- Maintenance Equipment Considerations

 

- Determining Your Maintenance Schedule

Maintenance Procedures

 

- Inspection

 

- Floatables and Sediment Clean Out

              

First Defense

®

 Installation Log

First Defense

®

 Inspection and Maintenance Log

COPYRIGHT STATEMENT:

 The contents of this manual, including the graphics contained herein, are intended for the use of the recipient to whom the 

document and all associated information are directed.  Hydro International plc owns the copyright of this document, which is supplied in confidence.  It 

must not be used for any purpose other than that for which it is supplied and must not be reproduced, in whole or in part stored in a retrieval system or 
transmitted in any form or by any means without prior permission in writing from Hydro International plc. First Defense

®

 is a trademarked hydrodynamic 

vortex separation device of Hydro International plc. A patent covering the First Defense

®

 has been granted.

DISCLAIMER:

 Information and data contained in this manual is exclusively for the purpose of assisting in the operation and maintenance of Hydro 

International plc’s First Defense

®

. No warranty is given nor can liability be accepted for use of this information for any other purpose. Hydro International 

plc has a policy of continuous product development and reserves the right to amend specifications without notice.

Page | 2

Page | 3

Introduction

The First Defense

®

 is an enhanced vortex separator 

that combines an effective and economical stormwater 

treatment  chamber  with  an  integral  peak  flow  bypass.  It 
efficiently  removes  total  suspended  solids  (TSS),  trash  and 

hydrocarbons from stormwater runoff without washing out 
previously captured pollutants. The First Defense

®

 is available 

in  several  model  configurations  (refer  to 

Section II. Model 

Sizes  &  Configurations

,  page  4)  to  accommodate  a  wide 

range of pipe sizes, peak flows and depth constraints.

Operation

The First Defense

®

 operates on simple fluid hydraulics.  It is self-

activating, has no moving parts, no external power requirement 

and  is  fabricated  with  durable  non-corrosive  components.  

No manual procedures are required to operate the unit and 
maintenance is limited to monitoring accumulations of stored 

pollutants  and  periodic  clean-outs.    The  First  Defense

®

 has 

been designed to allow for easy and safe access for inspection, 

monitoring and clean-out procedures.  Neither entry into the 

unit nor removal of the internal components is necessary for 

maintenance, thus safety concerns related to confined-space-

entry are avoided.   

Pollutant Capture and Retention

The internal components of the First Defense

®

 have been 

designed to optimize pollutant capture.  Sediment is captured 

and retained in the base of the unit, while  oil and floatables 
are stored on the water surface in the inner volume (Fig.1).  

The  pollutant  storage  volumes  are  isolated  from  the  built-in 
bypass  chamber  to  prevent  washout  during  high-flow  storm 

events. The sump of the First Defense

®

 retains a standing 

water level between storm events. This ensures a quiescent 

flow regime at the onset of a storm, preventing resuspension 

and washout of pollutants captured during previous events.

Accessories such as oil absorbent pads are available for 
enhanced oil removal and storage.  Due to the separation 

of  the  oil  and  floatable  storage  volume  from  the  outlet,  the 
potential for washout of stored pollutants between clean-outs 

is minimized.   

• Inlet options include surface grate or multiple inlet pipes
• 

Integral high capacity bypass conveys large peak flows without   

  the need for “offline” arrangements using separate junction 

  manholes
• Proven to prevent pollutant washout at up to 500% of its 

  treatment flow

• 

Long flow path through the device ensures a long residence 

  time within the treatment chamber, enhancing pollutant settling 
• 

Delivered to site pre-assembled and ready for installation

Advantages

• Stormwater treatment at the point of entry into the drainage line
• 

Sites constrained by space, topography or drainage profiles 

  with limited slope and depth of cover
• 

Retrofit installations where stormwater treatment is placed on or 

  tied into an existing storm drain line
• 

Pretreatment for filters, infiltration and storage

Applications

Oil

Max Oil

Storage Depth

Sediment 

Storage

Sediment

Fig.1 Pollutant storage volumes in the First Defense

®

.

Содержание First Defense

Страница 1: ......

Страница 2: ......

Страница 3: ......

Страница 4: ...Operation and Maintenance Manual First Defense and First Defense HC Vortex Separator for Stormwater Treatment Stormwater Solutions Turning Water Around ...

Страница 5: ...a wide range of pipe sizes peak flows and depth constraints Operation The First Defense operates on simple fluid hydraulics It is self activating has no moving parts no external power requirement and is fabricated with durable non corrosive components No manual procedures are required to operate the unit and maintenance is limited to monitoring accumulations of stored pollutants and periodic clean...

Страница 6: ...ose The open diameter of this access shaft is 15 inches in diameter Fig 3 Therefore the nozzle fitting of any vactor hose used for maintenance should be less than 15 inches in diameter Determining Your Maintenance Schedule The frequency of clean out is determined in the field after installation During the first year of operation the unit should be inspected every six months to determine the rate o...

Страница 7: ...ones etc Crow bar or other tool to remove grate or lid Pole with skimmer or net if only floatables are being removed Sediment probe such as a Sludge Judge Vactor truck flexible hose recommended First Defense Maintenance Log Floatables and sediment Clean Out Procedures 1 Set up any necessary safety equipment around the access port or grate of the First Defense as stipulated by local ordinances Safe...

Страница 8: ...CLE ALL THAT APPLY GRATED INLET CATCH BASIN INLET PIPE FLOW THROUGH First Defense Inspection and Maintenance Log Initials Depth of Floatables and Oils Sediment Depth Measured Volume of Sediment Removed Site Activity and Comments Date Hydro International Stormwater 94 Hutchins Drive Portland ME 04102 Tel 207 756 6200 Fax 207 756 6212 Web www hydro int com Hydro International Stormwater 94 Hutchins ...

Страница 9: ... Operation and Maintenance Manual First Defense Operation and Maintenance Manual Hydro International Stormwater 94 Hutchins Drive Portland ME 04102 Tel 207 756 6200 Fax 207 756 6212 Web www hydro int com NOTES Notes ...

Страница 10: ...s Hydro Experience it is the essence of Hydro It s interwoven into every strand of Hydro s story from our products to our people our engineering pedigree to our approach to business and problem solving HX is a stamp of quality and a mark of our commitment to optimum process performance A Hydro solution is tried tested and proven There is no equivalent to Hydro HX FD_O M_D1502 ...

Отзывы: