HYDAC FILTER SYSTEMS GMBH
Operation | 7
BeWa FCU1310 3371346g en-us lq
77 / 148
To guarantee valid and direct measurements,
prime the FCU. To do this, draw in approx. 120 ml
fluid via the inlet hose in order to completely fill the
hydraulic circuit and the inlet hose.
If the FCU is not primed, an air-oil mixture at the
start of measurement will flow through the FCU.
The sensor will interpret this air-oil mixture as par-
ticulate soiling and will thus falsify the measure-
ment result.
For an initial test without priming the FCU and
hoses, you need ≥ 300 ml of fluid.
Make sure that the following sequence is observed:
ü
You have performed all of the steps listed in chapter
Putting the FCU into operation [
.
1.
Connect the suction hose (color: clear transparent) with
the INLET of theFCU.
Place the other end of the suction hose (color: clear
transparent) into a depressurized container.
ð
This completes the hydraulic installation.